![Daikin RZQG71~140L7V1B Service Manual Download Page 163](http://html1.mh-extra.com/html/daikin/rzqg71-140l7v1b/rzqg71-140l7v1b_service-manual_4705720163.webp)
Emergency Operation
ESIE12-06
152
Field Setting
4. Emergency Operation
4.1 Forced Operation
As emergency operational methods, there are three methods as shown below. Choose the best
method that is suitable for each purpose of use.
Emergency Operation (Forced operation)
1. Turn off the power supply.
2. Changeover the switch of indoor unit PCB (SS1) from NORM (Normal) to EMG
(Emergency).
3. Changeover the switches of outdoor unit PCB (DS1) as shown below.
4. When the power is turned ON, the operation will be forcibly activated.
(Precautions)
1. Make sure that the power is turned off before changing the switch.
2. When returning to the normal operation, make sure that the power is turned off before
returning each switch to the original position.
3. When the protection device is activated during the emergency operation, the unit stops the
operation once and restarts three minutes later.
4. When there is an error on PCB, the emergency operation cannot be used.
Name
Application Setting method
Operation
Thermistor
detection
Activation
of
protection
device
Fan
Drain
Pump
Remark
(1)
Emergency
operation
(Forced
operation)
Forced
operation
in service
By SS1 switch
of indoor unit
PCB
×
×
k
k
No temperature
control
By DS switch of
outdoor unit
PCB
×
×
k
—
(2) Test
Operation
When
checking
the
operation
after
installation
By Inspection /
Test Operation
button of the
remote
controller
×
k
k
k
No temperature
control
By Test
Operation
button of
outdoor PCB
(3) Emergency
operation
When the
wireless
remote
controller
is lost
Press the
"Emergency
operation"
switch of the
indoor unit
panel.
k
k
k
k
Remote controller
transmission stop,
actuators such as fan
and pump are ON
Factory setting
Emergency operation
NORM.
EMG.
NORM.
EMG.
COOL
ON
1
OFF
2
HEAT
ON
1
2
COOL
ON
1
OFF
2
HEAT
ON
1
2
COOL
ON
1
OFF
2
HEAT
ON
1
2
Factory setting
Cooling
Heating
Summary of Contents for RZQG71~140L7V1B
Page 2: ......
Page 14: ...ESIE12 06 Outlook Outdoor Units General Information 3 2 Outlook Outdoor Units...
Page 15: ...Outlook Outdoor Units ESIE12 06 4 General Information...
Page 16: ...ESIE12 06 Functions 5 Part 2 Functions 1 Functions 5 1 1 Indoor Unit 5 1 2 Outdoor Unit 5...
Page 18: ...ESIE12 06 Specifications 7 Part 3 Specifications 1 Specifications 8 2 Operation range 75...
Page 19: ...Specifications ESIE12 06 8 Specifications 1 Specifications RZQG71V FVQ71CVEB RZQG71L7V1B...
Page 20: ...ESIE12 06 Specifications Specifications 9 FUQ71BWV1B RZQG71L7V1B FUQ71BVV1B RZQG71L7V1B...
Page 21: ...Specifications ESIE12 06 10 Specifications FHQG71CVEB RZQG71L7V1B FCQHG71FVEB RZQG71L7V1B...
Page 22: ...ESIE12 06 Specifications Specifications 11 FCQG71FVEB RZQG71L7V1B FBQ71C8VEB RZQG71L7V1B...
Page 23: ...Specifications ESIE12 06 12 Specifications FAQ71CVEB RZQG71L7V1B...
Page 24: ...ESIE12 06 Specifications Specifications 13 RZQG71L7V1B...
Page 25: ...Specifications ESIE12 06 14 Specifications RZQG71Y FVQ71CVEB RZQG71L7Y1B...
Page 26: ...ESIE12 06 Specifications Specifications 15 FUQ71BWV1B RZQG71L7Y1B FHQG71CVEB RZQG71L7Y1B...
Page 27: ...Specifications ESIE12 06 16 Specifications FCQHG71FVEB RZQG71L7Y1B FCQG71FVEB RZQG71L7Y1B...
Page 28: ...ESIE12 06 Specifications Specifications 17 FBQ71C8VEB RZQG71L7Y1B FAQ71CVEB RZQG71L7Y1B...
Page 29: ...Specifications ESIE12 06 18 Specifications RZQG71L7Y1B...
Page 31: ...Specifications ESIE12 06 20 Specifications FUQ100BVV1B RZQG100L7V1B FHQG100CVEB RZQG100L7V1B...
Page 32: ...ESIE12 06 Specifications Specifications 21 FCQHG100FVEB RZQG100L7V1B FCQG100FVEB RZQG100L7V1B...
Page 33: ...Specifications ESIE12 06 22 Specifications FBQ100C8VEB RZQG100L7V1B FAQ100CVEB RZQG100L7V1B...
Page 34: ...ESIE12 06 Specifications Specifications 23 RZQG100L7V1B...
Page 36: ...ESIE12 06 Specifications Specifications 25 FHQG100CVEB RZQG100L7Y1B FCQHG100FVEB RZQG100L7Y1B...
Page 37: ...Specifications ESIE12 06 26 Specifications FCQG100FVEB RZQG100L7Y1B FBQ100C8VEB RZQG100L7Y1B...
Page 38: ...ESIE12 06 Specifications Specifications 27 FAQ100CVEB RZQG100L7Y1B...
Page 39: ...Specifications ESIE12 06 28 Specifications RZQG100L7Y1B...
Page 41: ...Specifications ESIE12 06 30 Specifications FUQ125BVV1B RZQG125L7V1B FHQG125CVEB RZQG125L7V1B...
Page 42: ...ESIE12 06 Specifications Specifications 31 FDQ125C7VEB RZQG125L7V1B FCQHG125FVEB RZQG125L7V1B...
Page 43: ...Specifications ESIE12 06 32 Specifications FCQG125FVEB RZQG125L7V1B FBQ125C8VEB RZQG125L7V1B...
Page 44: ...ESIE12 06 Specifications Specifications 33 RZQG125L7V1B...
Page 46: ...ESIE12 06 Specifications Specifications 35 FHQG125CVEB RZQG125L7Y1B FDQ125C7VEB RZQG125L7Y1B...
Page 47: ...Specifications ESIE12 06 36 Specifications FCQHG125FVEB RZQG125L7Y1B FCQG125FVEB RZQG125L7Y1B...
Page 48: ...ESIE12 06 Specifications Specifications 37 FBQ125C8VEB RZQG125L7Y1B...
Page 49: ...Specifications ESIE12 06 38 Specifications RZQG125L7Y1B...
Page 51: ...Specifications ESIE12 06 40 Specifications FCQHG140FVEB RZQG140L7V1B FCQG140FVEB RZQG140L7V1B...
Page 52: ...ESIE12 06 Specifications Specifications 41 FBQ140C8VEB RZQG140L7V1B...
Page 53: ...Specifications ESIE12 06 42 Specifications RZQG140L7V1B...
Page 55: ...Specifications ESIE12 06 44 Specifications FCQHG140FVEB RZQG140L7Y1B FCQG140FVEB RZQG140L7Y1B...
Page 56: ...ESIE12 06 Specifications Specifications 45 FBQ140C8VEB RZQG140L7Y1B...
Page 57: ...Specifications ESIE12 06 46 Specifications RZQG140L7Y1B...
Page 59: ...Specifications ESIE12 06 48 Specifications FCQHG71FVEB RZQSG71L2V1B FCQG71FVEB RZQSG71L2V1B...
Page 60: ...ESIE12 06 Specifications Specifications 49 FBQ71C8VEB RZQSG71L2V1B FAQ71CVEB RZQSG71L2V1B...
Page 61: ...Specifications ESIE12 06 50 Specifications RZQSG71L2V1B...
Page 64: ...ESIE12 06 Specifications Specifications 53 FBQ100C8VEB RZQSG100L7V1B FAQ100CVEB RZQSG100L7V1B...
Page 65: ...Specifications ESIE12 06 54 Specifications RZQSG100L7V1B...
Page 68: ...ESIE12 06 Specifications Specifications 57 FBQ100C8VEB RZQSG100L7Y1B FAQ100CVEB RZQSG100L7Y1B...
Page 69: ...Specifications ESIE12 06 58 Specifications RZQSG100L7Y1B...
Page 72: ...ESIE12 06 Specifications Specifications 61 FCQG125FVEB RZQSG125L7V1B FBQ125C8VEB RZQSG125L7V1B...
Page 73: ...Specifications ESIE12 06 62 Specifications RZQSG125L7V1B...
Page 76: ...ESIE12 06 Specifications Specifications 65 FCQG125FVEB RZQSG125L7Y1B FBQ125C8VEB RZQSG125L7Y1B...
Page 77: ...Specifications ESIE12 06 66 Specifications RZQSG125L7Y1B...
Page 80: ...ESIE12 06 Specifications Specifications 69 FBQ140C8VEB RZQSG140L7V1B...
Page 81: ...Specifications ESIE12 06 70 Specifications RZQSG140L7V1B...
Page 84: ...ESIE12 06 Specifications Specifications 73 FBQ140C8VEB RZQSG140L7Y1B...
Page 85: ...Specifications ESIE12 06 74 Specifications RZQSG140L7Y1B...
Page 86: ...ESIE12 06 Operation range Specifications 75 2 Operation range Smart...
Page 87: ...Operation range ESIE12 06 76 Specifications EDP...
Page 88: ...ESIE12 06 Operation range Specifications 77 Classic...
Page 89: ...Operation range ESIE12 06 78 Specifications...
Page 131: ...Function Details ESIE12 06 120 Function and Control limit and or Tc Upper limit...
Page 161: ...Field Setting from Outdoor Unit PCB ESIE12 06 150 Field Setting Outdoor unit...
Page 162: ...ESIE12 06 Field Setting from Outdoor Unit PCB Field Setting 151 3 2 7 Troubleshooting...
Page 165: ...Emergency Operation ESIE12 06 154 Field Setting...
Page 265: ...ESIE12 06 254 Service Diagnosis...
Page 279: ...Precautions for New Refrigerant R 410A ESIE12 06 268 Appendix...