
24
English
7.3 Fresh Air Control*
11-levels control can be realized for the amount of fresh air taken in. The function not only facilitates the health
of users, but also controls the electricity consumption loss because of taking in fresh air. This kind of control
can be carried out through the wired controller. The function can set at any time, goes into effect at any time,
and features very simple operation. (Refer to the section of wired controller instructions for detailed operation.)
Outdoor
Fresh Air
Indoor Side
Air Damper
Fresh Air
Air Intake Pipe
Air Supply Pipe
Before starting up
the unit, please remove
all the sealing fi lm on the
healthy fi lter block
7.3
Fig.
7.4 The head of delivery of the condensate drainage pump*
It can reach 1.1m, so that the engineering
installation is very convenient and prompt.
Head of
Delivery of
Pump is
1100mm
For:
FDM24PEV1K
FDM30PEV1K
FDM36PEV1K
FDM42PEV1K
FDM48PEV1K
FDYM24PEV1K
FDYM30PEV1K
FDYM36PEV1K
FDYM42PEV1K
FDYM48PEV1K
7.4
Fig.
01_EN_EM09A058A.indd 24
01_EN_EM09A058A.indd 24
5/13/2010 11:43:29 AM
5/13/2010 11:43:29 AM