a
a
Compressor wire terminals cover
5
Install the compressor insulation.
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
4.4 Expansion valve
4.4.1 Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform a mechanical check of the expansion valve
Prerequisite:
Power OFF the unit for 3 minutes. Then turn ON the unit and listen to
the expansion valve assembly. If the expansion valve does NOT make a latching
sound, continue with the electrical check of the expansion valve, see
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
144].
1
Remove the expansion valve insulation (if applicable) and visually check:
▪
For oil drops around the expansion valve. Locate and fix as necessary.
▪
Pipes for signs of damage. Replace pipes as needed.
▪
Coil wires for signs of damage. Replace expansion valve coil as needed. See
76].