![Daikin RXP50N5V1B Installer'S Reference Manual Download Page 48](http://html1.mh-extra.com/html/daikin/rxp50n5v1b/rxp50n5v1b_installers-reference-manual_2459930048.webp)
9
|
Electrical installation
Installer reference guide
48
RXF50~71D5V1B
R32 split series
4P519439-18T – 2022.06
b
c
DC P1+
DC N1-
a
d
e
g
f
a
Multimeter (DC voltage range)
b
S80 – reversing solenoid valve lead wire
c
S20 – electronic expansion valve lead wire
d
S40 – thermal overload relay lead wire
e
S90 – thermistor lead wire
f
LED
g
S70 – fan motor lead wire
WARNING
The appliance MUST be installed in accordance with national wiring regulations.
WARNING
▪
All wiring MUST be performed by an authorised electrician and MUST comply
with the applicable legislation.
▪
Make electrical connections to the fixed wiring.
▪
All components procured on-site and all electrical construction MUST comply
with the applicable legislation.
WARNING
ALWAYS use multicore cable for power supply cables.
INFORMATION
Also read the precautions and requirements in the
INFORMATION
Also read
"9.1.3 Specifications of standard wiring components"
50].
Summary of Contents for RXP50N5V1B
Page 1: ...Installer reference guide R32 split series RXP50N5V1B RXP60N5V1B RXP71N5V1B...
Page 70: ......
Page 71: ......