background image

English

6

En

gl

is

h

4.

Purging air and checking gas leakage.

• When piping work is completed, it is necessary to purge the air and check for gas leakage.

 WARNING

1) Do not mix any substance other than the specified refrigerant (R410A) into the refrigeration cycle.
2) When refrigerant gas leaks occur, ventilate the room as soon and as much as possible.
3) R410A, as well as other refrigerants, should always be recovered and never be released directly into the environment.
4) Use a vacuum pump for R410A exclusively. Using the same vacuum pump for different refrigerants may damage the vacuum 

pump or the unit.

• If using additional refrigerant, perform air purging from the refrigerant pipes and 

indoor unit using a vacuum pump, then charge additional refrigerant.

• Use a hexagonal wrench (4mm) to operate the stop valve rod.
• All refrigerant pipe joints should be tightened with a torque wrench at the specified 

tightening torque.

*1. Pipe length vs. vacuum pump run time.  

*2. If the compound pressure gauge pointer swings back, refrigerant may have water content or a loose pipe joint may exists.  Check 

all pipe joints and retighten nuts as needed, then repeat steps 2) through 4).

1) Connect projection side of charging hose (which comes from gauge manifold) to gas stop valve’s service port.

2) Fully open gauge manifold’s low-pressure valve (Lo) and completely close its high-pressure valve (Hi).  

(High-pressure valve subsequently requires no operation.)

3)  Do vacuum pumping and make sure that the compound pressure gauge reads –0.1MPa (–76cmHg)*1.

4) Close gauge manifold’s low-pressure valve (Lo) and stop vacuum pump.  

(Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not swing back.)*2.

5) Remove caps from liquid stop valve and gas stop valve.

6) Turn the liquid stop valve’s rod 90 degrees counterclockwise with a hexagonal wrench to open valve. 

Close it after 5 seconds, and check for gas leakage.
Using soapy water, check for gas leakage from indoor unit’s flare and outdoor unit’s flare and valve rods.  
After the check is complete, wipe all soapy water off.

7) Disconnect charging hose from gas stop valve’s service port, then fully open liquid and gas stop valves.

(Do not attempt to turn valve rod beyond its stop.)

8) Tighten valve caps and service port caps for the liquid and gas stop valves with a torque wrench at the specified torques.

Pipe length

Up to 15 metres

More than 15 metres

Run time

Not less than 10 min.

Not less than 15 min.

Gauge 
manifold

Compound 
pressure gauge

Pressure meter

Low-pressure 
valve

High-pressure 
valve

Charging 
hoses

Vacuum pump

Valve caps

Service port

Liquid 
stop 
valve

Gas 
stop 
valve

01_EN_3P232550-13C.fm  Page 6  Thursday, September 16, 2010  11:52 AM

Summary of Contents for RXL35G3V1

Page 1: ...ON MANUAL Installation manual Installationsmanual Installationshandbok Installasjonsh ndbok Asennusohje Installierungshandbuch Manuel d installation Instrukcja montazu Installatiehandleiding R410A Spl...

Page 2: ...2010 KEMA Quality B V 74736 KRQ EMC97 4957 Umeda Center Bldg 2 4 12 Nakazaki Nishi Kita ku Osaka 530 8323 Japan DAIKIN INDUSTRIES LTD 3SB64417 12H RXL20G3V1B RXL25G3V1B RXL35G3V1B Shinri Sada Manager...

Page 3: ...ntrol box lid may result in electric shocks fire or over heating terminals If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant come...

Page 4: ...are more than 3 meter away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since dra...

Page 5: ...or pooling of water may occur Foot bolt hole centres 580mm 120mm From unit s side Max allowable height Min allowable length Max allowable length 20m 1 5m 15m Liquid pipe Gas pipe O D 6 4mm O D 12 7mm...

Page 6: ...of the foundation bolts Prepare four sets of M8 or M10 foundation bolts nuts and washers each which are available on the market It is best to screw in the foundation bolts until their length are 20mm...

Page 7: ...the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wrenches Cut...

Page 8: ...valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping and...

Page 9: ...tion O D 12 7mm O D 6 4mm I D 14 16mm I D 8 10mm Minimum bend radius Thickness 10mm Min 40mm or more 30mm or more Thickness 0 8mm C1220T O Filling a cylinder with an attached siphon Stand the cylinder...

Page 10: ...d stop valve with a hexagonal wrench 4 After two to three minutes close the gas stop valve and stop forced cooling operation Forced cooling operation 1 Press the Forced Operation switch SW1 to begin f...

Page 11: ...ctor and terminal number 2 connector as shown in the illustration After inserting the inter unit wirings into the connectors lightly pull the wires and make sure that the wires will not fall off 3 Tig...

Page 12: ...n place Ground terminal installation Use the following method when installing the round crimp style terminal CAUTION When connecting the inter unit wirings to the terminal board using a single core wi...

Page 13: ...in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut off t...

Page 14: ...1010 HT 3P232550 13C M10B238 Two dimensional bar code is a code for manufacturing 00_CV_3P232550 13C fm Page 2 Thursday September 16 2010 11 51 AM...

Reviews: