background image

En

gl

is

h

Dansk

Svenska

No

rs

k

Suomi

Deutsc

h

Fran

çais

Р

ó

сс

ê

ий

Po

ls

k

i

Nederlands

OUTDOOR UNIT

INSTALLATION MANUAL

Installation manual

Installationsmanual

Installationshandbok

Installasjonshåndbok

Asennusohje

Installierungshandbuch

Manuel d’installation

   

Instrukcja montazu

Installatiehandleiding

R410A Split Series

MODEL

RXL35G3V1B

00_CV_3P232550-13C.fm  Page 1  Thursday, September 16, 2010  11:51 AM

Summary of Contents for RXL35G3V1

Page 1: ...ON MANUAL Installation manual Installationsmanual Installationshandbok Installasjonsh ndbok Asennusohje Installierungshandbuch Manuel d installation Instrukcja montazu Installatiehandleiding R410A Spl...

Page 2: ...2010 KEMA Quality B V 74736 KRQ EMC97 4957 Umeda Center Bldg 2 4 12 Nakazaki Nishi Kita ku Osaka 530 8323 Japan DAIKIN INDUSTRIES LTD 3SB64417 12H RXL20G3V1B RXL25G3V1B RXL35G3V1B Shinri Sada Manager...

Page 3: ...ntrol box lid may result in electric shocks fire or over heating terminals If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant come...

Page 4: ...are more than 3 meter away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since dra...

Page 5: ...or pooling of water may occur Foot bolt hole centres 580mm 120mm From unit s side Max allowable height Min allowable length Max allowable length 20m 1 5m 15m Liquid pipe Gas pipe O D 6 4mm O D 12 7mm...

Page 6: ...of the foundation bolts Prepare four sets of M8 or M10 foundation bolts nuts and washers each which are available on the market It is best to screw in the foundation bolts until their length are 20mm...

Page 7: ...the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wrenches Cut...

Page 8: ...valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping and...

Page 9: ...tion O D 12 7mm O D 6 4mm I D 14 16mm I D 8 10mm Minimum bend radius Thickness 10mm Min 40mm or more 30mm or more Thickness 0 8mm C1220T O Filling a cylinder with an attached siphon Stand the cylinder...

Page 10: ...d stop valve with a hexagonal wrench 4 After two to three minutes close the gas stop valve and stop forced cooling operation Forced cooling operation 1 Press the Forced Operation switch SW1 to begin f...

Page 11: ...ctor and terminal number 2 connector as shown in the illustration After inserting the inter unit wirings into the connectors lightly pull the wires and make sure that the wires will not fall off 3 Tig...

Page 12: ...n place Ground terminal installation Use the following method when installing the round crimp style terminal CAUTION When connecting the inter unit wirings to the terminal board using a single core wi...

Page 13: ...in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut off t...

Page 14: ...1010 HT 3P232550 13C M10B238 Two dimensional bar code is a code for manufacturing 00_CV_3P232550 13C fm Page 2 Thursday September 16 2010 11 51 AM...

Reviews: