background image

En

gl

is

h

Dansk

Svenska

No

rs

k

Suomi

Deutsc

h

Fran

çais

Р

ó

сс

ê

ий

Po

ls

k

i

Nederlands

OUTDOOR UNIT

INSTALLATION MANUAL

Installation manual

Installationsmanual

Installationshandbok

Installasjonshåndbok

Asennusohje

Installierungshandbuch

Manuel d’installation

   

Instrukcja montazu

Installatiehandleiding

R410A Split Series

MODEL

RXL20G2V1B

00_CV_3P232550-1.fm  Page 1  Tuesday, August 12, 2008  9:29 PM

Summary of Contents for RXL20G2V1B

Page 1: ...LATION MANUAL Installation manual Installationsmanual Installationshandbok Installasjonsh ndbok Asennusohje Installierungshandbuch Manuel d installation Instrukcja montazu Installatiehandleiding R410A...

Page 2: ...RXL20G2V1B DAIKIN INDUSTRIES LTD Noboru Murata Manager Quality Control Department 1st of Sep 2008 Low Voltage 2006 95 EC Electromagnetic Compatibility 2004 108 EC DAIKIN TCF 015 M3 07 2008 KEMA Qualit...

Page 3: ...control box lid may result in electric shocks fire or over heating terminals If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant c...

Page 4: ...hey are more than 3 meter away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since...

Page 5: ...or unit to install Tighten the screws Stop valve cover O D 9 5mm Gas pipe Liquid pipe O D 6 4mm 20g m 15m 20m Max allowable length Max allowable height Additional refrigerant required for refrigerant...

Page 6: ...ans of the foundation bolts Prepare four sets of M8 or M10 foundation bolts nuts and washers each which are available on the market It is best to screw in the foundation bolts until their length are 2...

Page 7: ...ng the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wrenches...

Page 8: ...top valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping...

Page 9: ...mal insulation O D 9 5mm O D 6 4mm I D 12 15mm I D 8 10mm Minimum bend radius Thickness 10mm Min 30mm or more Thickness 0 8mm C1220T O Filling a cylinder with an attached siphon Stand the cylinder upr...

Page 10: ...er supply is turned OFF Turn it OFF if has not been turned OFF 2 Remove the stop valve cover 3 Disconnect the selective connector for standby electricity saving 4 Turn ON the main power supply CAUTION...

Page 11: ...prox 15 minutes CAUTION 1 When pressing the switch do not touch the terminal block It has a high voltage so doing so may cause electric shock 2 After closing the liquid stop valve close the gas stop v...

Page 12: ...cautions to be taken for power supply wiring Use a round crimp style terminal for connection to the power supply terminal board In case it cannot be used due to unavoidable reasons be sure to observe...

Page 13: ...wer in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut of...

Page 14: ...0809 HT 3P232550 1 M08B046 Two dimensional bar code is a code for manufacturing 00_CV_3P232550 1 fm Page 2 Tuesday August 12 2008 9 29 PM...

Reviews: