![background image](http://html1.mh-extra.com/html/daikin/rne50lv1/rne50lv1_service-manual_2459874004.webp)
Outer Panels
Si011415E
2
Removal Procedure
1. Outer Panels
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1
Remove the 4 screws
and remove the top
panel.
2
Remove the 4 screws
of the discharge grille.
3
Unfasten the 6 hooks
and remove the
discharge grille.
Top panel
(R21442)
Discharge grille
(R21443)
Discharge grille
(R21444)