
IM 738-2
35
Mechanical Installation:
RPS/RDT Factory Split at Condensing Unit
10
After condenser unit is set in place, install the top cap saved
in Step 1. See Figure 45.
11
Caulk (watertight) ends of splice cap and vertical seam. See
Figure 45.
12
Install 1/2" bolt removed in Step 5. See Figure 45.
13
Install splice cover (provided), see Figure 45.
Figure 45. Caulk and install parts, Steps 10–13
Reinstall top cap
saved from Step 1
Caulk ends of
splice cap
Nut clip-on provided
Reinstall 1/2" bolt
saved from Step 1
Summary of Contents for RDT- 036c
Page 131: ...IM 738 2 129...