Test Operation
Si33-105
108
Test Operation R407C PLUS Series Heat Recovery System
Note:
Resetting of power supply switch is necessary after capacity setting.
1
Transmission terminal
Indoor unit, Cool/Heat
selector Outdoor - Outdoor
2
Service monitor LED
(Green)
3
Function setting mode
switch and LED
LED
4
Function of setting
between cooling and
heating
5
Outdoor unit
Capacity setting switch
Switches for capacity setting when the outdoor unit PC board is
replaced to spare parts PC board.
Refer table below.
HAP
LED-A
SERV. MON.
(V0836)
C/H SELECT
IN/D
OUT/D
SS1
(V0838)
SS2
B
D
F
H
SS3
SS4
SS5
A
C
E
G
(V0848)
SS2
SS3
SS4
SS5
A
B
C
D
E
F
G
H
RSEYP16KJ
!
!
!
!
RSEYP18KJ
!
!
!
!
RSEYP20KJ
!
!
!
!
RSEYP24KJ
!
!
!
!
RSEYP26KJ
!
!
!
!
RSEYP28KJ
!
!
!
!
RSEYP30KJ
!
!
!
!
Capacity setting table
Summary of Contents for R407C PLUS
Page 1: ...System R407C PLUS Series Heat Recovery System Si33 105 Service Manual ...
Page 11: ...Introduction Si33 105 x ...
Page 41: ...Specifications Si33 105 30 Specifications R407C PLUS Series Heat Recovery System ...
Page 147: ...Test Operation Si33 105 136 Test Operation R407C PLUS Series Heat Recovery System ...
Page 263: ...Si33 105 iv Index ...