SERVICE AND LIMITED WARRANTY 

All units are factory tested and guaranteed for 12 months as of the first start-up or 18 months as of delivery. 

These units have been developed and constructed according to high quality standards ensuring years of failure free operation. 

However, 

the  unit  requires  maintenance  even  during  the  warranty  period,  from  the  time  of  installation  and  not  just  from  the 
commissioning date. 

We strongly advise stipulating a maintenance contract with a service authorized by the manufacturer to ensure 

efficient and problem free service, thanks to the expertise and experience of our personnel. 
It must be borne in mind that operating the unit in an inappropriate manner, beyond its operating limits or not performing proper 
maintenance according to this manual can void the warranty. Observe the following points, to conform to warranty limits: 
1. 

The unit cannot function beyond the specified limits. 

2. 

The electrical power supply must be within the voltage limits and without voltage harmonics or sudden changes.  

3. 

The three-phase power supply must not have an unbalance between  phases exceeding 3%. The unit must stay turned off 
until the electrical problem has been solved. 

4. 

No safety device, either mechanical, electrical, or electronic must be disabled or overridden.  

5. 

The water used for filling the water circuit must be clean and suitably treated. A mechanical filter must be installed at the point 
closest to the 

BPHE

 inlet. 

6. 

The value of the 

BPHE

 water flow must be included in the declared range for the unit considered, refer to the 

CSS

 selection 

software. 

 

Figure 3- Refrigerant circuit scheme EWWQ 014 - 033 KCW1N

 

 

 

 

 

 

 

 

 

Figure 4- Refrigerant circuit scheme EWWQ 049 - 064 KCW1N 

 

 

 

Summary of Contents for hydrocube EWWQ-KC

Page 1: ...maintenance operation manual EWWQ014KCW1N EWWQ025KCW1N EWWQ033KCW1N EWWQ049KCW1N EWWQ064KCW1N D EIMHP01501 22_01EN REV 01 Date 11 2022 Supersedes D EIMHP01501 22_00EN EWWQ KC Water cooled scroll chill...

Page 2: ...ectric power supply 11 12 4 Interconnection cables 11 13 OPERATOR S REPONSIBILITIES 12 14 MAINTENANCE 13 14 1 Routine maintenance 13 15 SERVICE AND LIMITED WARRANTY 16 16 BEFORE STARTING 18 LIST OF TA...

Page 3: ...circuit leaks fire or other damage to the equipment Be sure only to use accessories optional equipment and spare parts made by Daikin which are specifically designed for use with the equipment and ha...

Page 4: ...l describes the procedures for unpacking installing and connecting the EWWQ units This appliance is intended to be used by expert or trained users in shops in light industry and on farms or for commer...

Page 5: ...kin On Site Standard features Glycol application for chilled water temperature down to 10 C Powered Contact General alarm Voltage free digital contacts general operation Reversing Valve Evaporator Wat...

Page 6: ...ION RANGE Figure 1 Operating limits on EWWQ014 033 Figure 2 Operating limits EWWQ049 064 ELWT Evaporator leaving water temperature CLWT Condenser leaving water temperature 1 Operation with water 2 Ope...

Page 7: ...anger of fire due to leakage of non flammable gas 4 Select the location of the unit in such a way that the sound generated by the unit does not disturb anyone 5 Ensure that water cannot cause any dama...

Page 8: ...tly into the heat exchanger 2 Drain taps must be provided at all low points of the system to permit complete drainage of the circuit during maintenance or in case of shut down 3 Anti vibration systems...

Page 9: ...so that normal servicing of the water filter can be accomplished without draining the complete system 3 Air purge valves must be provided at all high points of the system The vents should be located...

Page 10: ...circuit to make sure that the water pressure will never exceed the maximum allowable working pressure 11 PIPING INSULATION The complete water circuit inclusive all piping must be insulated to prevent...

Page 11: ...breaker remove or switch off the fuses 12 2Connection of the water cooled water chiller power supply 1 Install cable gland to proper tight main power supply cable 2 Using the appropriate cable connec...

Page 12: ...re to keep this equipment in good working order However during operation and maintenance it is essential to observe the following instructions Do not allow unauthorized and or unqualified personnel to...

Page 13: ...nvironments can be defined as follows Industrial environment with possible concentration of fumes result of combustion and chemical process Coastal environment Highly polluted urban environment Rural...

Page 14: ...n calcium carbonate is used An increase in pressure drops or a decrease in thermal efficiency means that the heat exchangers are clogged In environments with a high concentration of airborne particles...

Page 15: ...time without operation are still subject to those routine maintenance steps Monthly Yearly Seasonal List of Activities Note 8 Weekly Note 1 Note 2 General Reading of operating data Note 3 X Visual ins...

Page 16: ...rming proper maintenance according to this manual can void the warranty Observe the following points to conform to warranty limits 1 The unit cannot function beyond the specified limits 2 The electric...

Page 17: ...ALVE 13 LIQUID STOP VALVE POS COMPONENT CONNECTION D1 COMPRESSOR CONDENSER L1 1 L2 1 CONDENSER THERM EXP VALVE L1 2 L2 2 THERM EXP VALVE EVAPORATOR S1 EVAPORATOR COMPRESSOR S1 1 EVAPORATOR ACCUMULATOR...

Page 18: ...it can be switched on or off independently of the electrical supply to other items of the plant and equipment in general Refer to the wiring diagram terminals N L1 L2 L3 and PE 4 Supply water to the e...

Page 19: ...D EIMHP01501 22_01EN 19 20 NOTES...

Page 20: ...cy reliability or fitness for particular purpose of its content and the products and services presented therein Specifications are subject to change without prior notice Daikin Europe N V explicitly r...

Reviews: