Pump Down Operation
Part 7 Trial Operation and Field Settings
198
Reference
1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
Details
1. Remove the valve caps from the liquid stop valve and the gas stop valve.
2. Carry out forced cooling operation.
3. After 5 to10 minutes, close the liquid stop valve with a hexagonal wrench.
4. After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to Forced Cooling Operation on page 199 for details.
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R25008)
Hexagonal
wrench
Summary of Contents for FTX-N Series
Page 18: ...SiUS091601EA 13 Part 2 Specifications 1 Specifications 14 Part 2 Specifications...
Page 198: ...Check SiUS091601EA 193 Part 6 Service Diagnosis 18 24 class R24538 1 2 3 4 Multimeter...
Page 201: ...SiUS091601EA Check Part 6 Service Diagnosis 196 18 24 class R24539 DC DC W V U...
Page 229: ...SiUS091601EA Piping Diagrams Part 8 Appendix 224 RXL15QMVJU RXL18UMVJU 3D100007 3D123368...
Page 230: ...Piping Diagrams SiUS091601EA 225 Part 8 Appendix RXL24UMVJU 3D107985A...