Summary of Contents for FTNE50MV14
Page 2: ......
Page 3: ...1 POWERFUL or POWER CHILL Operation 2 5 9 12 14 15 16 18 21 24 25 26 28 31 37 41...
Page 4: ...2...
Page 5: ...3...
Page 6: ...4...
Page 7: ...5 FTNE50 60 1 2 3 4 5 7 8 9 11 12 13 14 10 FTNE15 20 25 35 1 2 3 10 4 5 7 9 8 6 14 11 13 12 6...
Page 8: ...6 page 14 page 12 page 16 Yellow FTNE15 20 25 35 Orange FTNE50 60 page 14...
Page 9: ...7 RNE15 20 25 RNE35 RNE50 60 RNE20 25 35 50 60...
Page 13: ...11 1 3 2 FTNE50 60...
Page 22: ...20...
Page 24: ...22...
Page 25: ...23...
Page 26: ...24...
Page 27: ...25 Choosing a site FTNE15 20 25 35 FTNE50 60 6 9 For FTNE50 60 only For FTNE50 60 only...
Page 33: ...31 FTNE15 20 25 35 Unit mm...
Page 34: ...32 FTNE50 60...
Page 35: ...33 65 or 80mm Right side Right back or Right bottom piping...
Page 36: ...34 Left side Left back or Left bottom piping G Left side Left back or Left bottom piping...
Page 38: ...36...
Page 41: ...39...
Page 43: ...41 RNE50 60 Inter unit wiring terminal block Trial Operation and Testing...
Page 44: ...42...
Page 71: ...Panduan Pemasangan Unit Outdoor...
Page 87: ......