INSTALLATION
Storage
In the event that it is necessary to store the unit before installation, it is necessary to observe some precautions:
-
do not remove the protective plastic;
-
protect the unit from dust, bad weather and any rodents;
-
do not expose the unit to direct sunlight;
-
do not use heat sources and / or open flames near the machine.
Although the unit is covered with a heat-shrink plastic sheet, it is not intended for long-term storage and must be removed
and replaced by tarpaulins or the like, more suitable for a longer period.
Environmental conditions must be within the following limits:
-
Minimum ambient temperature
: - 20 °C;
-
Maximum ambient temperature
: +40 °C;
-
Maximum R.H. : 95% not condensing.
Storage at a temperature below the minimum can cause damage to the components, instead at a temperature above the
maximum causes the opening of the safety valves, with consequent loss of refrigerant. Storage in a humid atmosphere
may damage electrical components.
Safety
All EWAT_B machines are built in compliance with the main European Directives (Machinery Directive, Low Voltage
Directive, Electromagnetic Compatibility Directive, PED Pressure Equipment Directive); be sure to receive, together with
the documentation, also the Declaration of Conformity (DoC) of the product to the directives.
Before installation and commissioning of the machinery, the people involved in this activity must have acquired the
information necessary to perform these tasks, applying all the information gathered in this manual. In particular:
-
the unit must be firmly anchored to the ground when it must not be moved;
-
the unit can only be lifted using the lifting points marked in yellow fixed to its base;
-
always protect operating personnel with personal protective equipment appropriate to the activities to be
performed. The individual devices commonly used are: helmet, glasses, gloves, headphones, safety shoes.
Further personal and collective protection devices must be adopted after having carried out an adequate analysis
of the specific risks in the relevant area, according to the activities to be carried out.
Receipt of the unit
Inspect the unit immediately after delivery. In particular, make sure that the machine is intact in all its parts and that there
are no deformations due to impacts. All components described in the delivery note must be inspected and checked. Should
any damage occur upon receipt of the machine, do not remove the damaged material and immediately make a written
complaint to the transport company, requesting the inspection of the unit; do not repair until inspection by the transport
company representative is carried out. Immediately report the damage to the manufacturer representative, a set of
photographs is helpful in recognizing responsibility.
The restitution of the machinery is intended as ex-factory Daikin Applied Europe S.p.A.
Daikin Applied Europe S.p.A. declines all responsibility for any damage that the machinery may suffer during transport to
the destination.
Use extreme caution when handling the unit to prevent damage to components.
Before installing the unit, check that the model and power supply voltage shown on the nameplate are correct.
Responsibility for any damage after acceptance of the unit cannot be attributed to the manufacturer.
Handling and lifting
Avoid bumping and/or jolting during loading/unloading unit from the truck and moving it. Do not push or pull the unit from
any part other than the base frame. Secure the unit inside the truck to prevent it from moving and causing damages. Do
not allow any part of the unit to fall during transportation or loading/unloading.
All units of the series are supplied with lifting points marked in yellow. Only these points may be used for lifting the unit, as
shown in the figure 2.
Use spacing bars to prevent damage to the condensation bank. Position these above the fan grills at a distance of at least
2.5 meters.
During the handling of the machine it is mandatory to provide all the devices necessary to guarantee personal safety.