ESIE10-01
General Outline
1–73
3
1
4
5
Correction factors
for water and glycol
mixture
How to use the
Correction factors
proposed in the
previous tables?
Q
Mixture Water and Glycol - Evaporator leaving water temperature > 4°C
•
Depending on the type and percentage (%) of glycol filled in the circuit (see table "Minimum
glycol percentage for low air temperature" on page 1–72 and table "Correction factors for
water and glycol mixture" on page 1–73).
•
Multiply the Cooling Capacity, the Compressor Power Input by the Correction factor of table
"Correction factors for water and glycol mixture" on page 1–73.
•
Starting from this new value of Cooling Capacity, calculate the Flow Rate (l/s) and the Evapo-
rator Pressure Drop (kPa).
•
Now multiply the new Flow Rate and the new Evaporator Pressure Drop by the Correction
Factors of table "Correction factors for water and glycol mixture" on page 1–73.
Ethylene Glycol (%)
10%
20%
30%
40%
50%
Ethylene Glycol
Cooling Capacity
0.991
0.982
0.972
0.961
0.946
Compressor Power Input
0.996
0.992
0.986
0.976
0.966
Flow Rate (
Δ
t)
1.013
1.040
1.074
1.121
1.178
Evaporator Pressure Drop
1.070
1.129
1.181
1.263
1.308
Propylene Glycol
Cooling Capacity
0.985
0.964
0.932
0.889
0.846
Compressor Power Input
0.993
0.983
0.969
0.948
0.929
Flow Rate (
Δ
t)
1.017
1.032
1.056
1.092
1.139
Evaporator Pressure Drop
1.120
1.272
1.496
1.792
2.128
Example
Unit Size:
EWAD650C-SS
Mixture:
Water
Working Condition:
ELWT 12/7°C – Condenser inlet air temperature 35°C
Cooling capacity:
647 kW
Power Input:
221 kW
Flow Rate (
Δ
t 5°C):
30.90 l/s
Evaporator pressure drop:
79 kPa
Mixture:
Water + Ethylene Glycol 30% (for a winter air temperature up to -15°C)
Working Condition:
ELWT 12/7°C – Condenser inlet air temperature 35°C
Cooling capacity:
647 x 0.972 = 629 kW
Power Input:
221 x 0.986 = 218 kW
Flow Rate (
Δ
t 5°C):
30.05 (referred to 629 kW) x 1.074 = 32.27 l/s
Evaporator pressure drop:
85 (referred to 32.27 l/s) x 1.181 = 100 kPa
Summary of Contents for EWAD620-C17C-SS
Page 2: ......
Page 8: ...ESIE10 01 1 2 Part 1 System Outline 3 1 1 5...
Page 111: ...ESIE10 01 General Outline Part 1 System Outline 1 105 3 1 4 5 1 36 1 Power Compressor 1 2...
Page 112: ...General Outline ESIE10 01 1 106 Part 1 System Outline 3 1 1 4 5 1 36 2 Power Compressor 3...
Page 113: ...ESIE10 01 General Outline Part 1 System Outline 1 107 3 1 4 5 1 36 3 Kit Pumps...
Page 122: ...General Outline ESIE10 01 1 116 Part 1 System Outline 3 1 1 4 5 1 36 12 Digital Inputs Board...
Page 123: ...ESIE10 01 General Outline Part 1 System Outline 1 117 3 1 4 5 1 36 13 Digital Outputs Board...
Page 124: ...General Outline ESIE10 01 1 118 Part 1 System Outline 3 1 1 4 5 1 36 14 Digital Outputs Board...
Page 127: ...ESIE10 01 General Outline Part 1 System Outline 1 121 3 1 4 5 1 36 17 Extension Control Fans 4...
Page 131: ...ESIE10 01 General Outline Part 1 System Outline 1 125 3 1 4 5 1 36 21 EEXV Compressor 1...
Page 134: ...General Outline ESIE10 01 1 128 Part 1 System Outline 3 1 1 4 5 1 36 24 EEXV Compressor 2...
Page 137: ...ESIE10 01 General Outline Part 1 System Outline 1 131 3 1 4 5 1 36 27 EEXV Compressor 3...
Page 138: ...General Outline ESIE10 01 1 132 Part 1 System Outline 3 1 1 4 5 1 36 28 Pumps Control...
Page 139: ...ESIE10 01 General Outline Part 1 System Outline 1 133 3 1 4 5 1 36 29 Terminals M1 M2...
Page 140: ...General Outline ESIE10 01 1 134 Part 1 System Outline 3 1 1 4 5 1 36 30 Terminals M3...
Page 141: ...ESIE10 01 General Outline Part 1 System Outline 1 135 3 1 4 5 1 36 31 Terminals M5 MQ...
Page 148: ...General Outline ESIE10 01 1 142 Part 1 System Outline 3 1 1 4 5...
Page 150: ...ESIE10 01 2 2 Part 2 Functional Description 3 1 2 5...
Page 170: ...The Digital Controller ESIE10 01 2 22 Part 2 Functional Description 3 1 2 4 5...
Page 200: ...Functional Control ESIE10 01 2 52 Part 2 Functional Description 3 1 2 4 5...
Page 202: ...ESIE10 01 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 254: ...Alarms and Events ESIE10 01 3 54 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...Controller Inputs and Outputs ESIE10 01 3 66 Part 3 Troubleshooting 3 1 3 4 5...
Page 280: ...ESIE10 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 286: ...Pre Test Run Checks ESIE10 01 4 8 Part 4 Commissioning and Test Run 3 1 4 5...
Page 289: ...ESIE10 01 Running Data Part 4 Commissioning and Test Run 4 11 3 4 5 1...
Page 290: ...Running Data ESIE10 01 4 12 Part 4 Commissioning and Test Run 3 1 4 5...