Test Run and Operation Data for EUWA*5-24KBZW1 and EUWY*5-24KBZW1
Pressures
The table below contains the measurable pressures.
Temperatures
The table below contains the measurable temperatures.
Voltages
The table below contains the measurable voltages.
Currents
The table below contains the currents and used fuses.
Measurement
Value
Suction pressure
4 – 8.5 bar
Discharge pressure
7 – 22 bar
Maximum water pressure
10 bar
Measurement
Value
Leaving water temperature
■
Standard: 5– 20°C
■
For ZH: -5 – 20°C
■
For ZL: -10 – 20°C
■
Heating: 35 - 50°C (only for
EUWY*5-24KBZW1)
Outdoor temperature
■
-15 – 43°C for standard unit
■
-10 – 43°C for glycol unit
Temperature difference at the air side
10 – 15°C
Temperature difference at the water side
3 – 8°C
Discharge temperature
80 – 120°C
Measurement
Value
Power supply voltage
Within ± 10% of the rated voltage
Phase imbalance
Within ± 2% of the rated voltage
Control circuit voltage
230 V AC for main electromagnetic switches
24 V DC for the controllers
Unit
Nominal current
Maximum current
Fuses
EUWAN5KBZW1
7.7 A
11.2 A
3 x 20 gL/gG
EUWAP5KBZW1
9.1 A
12.6 A
3 x 25 gL/gG
EUWAB5KBZW1
EUWAN8KBZW1
13.6 A
15.9 A
3 x 25 gL/gG
EUWAP8KBZW1
15.0 A
17.3 A
3 x 25 gL/gG
EUWAB8KBZW1
EUWAN10KBZW1
15.9 A
18.9 A
3 x 25 gL/gG
Summary of Contents for EUWAB10KBZW1
Page 2: ......
Page 8: ...ESIE11 02 vi Table of Contents 3 1 4 5...
Page 10: ...Introduction ESIE11 02 viii 3 1 4 5...
Page 12: ...ESIE11 02 1 2 Part 1 System Outline 3 1 1 5...
Page 86: ...Wiring Layout ESIE11 02 1 76 Part 1 System Outline...
Page 88: ...ESIE11 02 2 2 Part 2 Functional Description 3 1 2 5...
Page 128: ...The Digital Controller ESIE11 02 2 42 Part 2 Functional Description 3 1 2 4 5...
Page 130: ...ESIE11 02 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 168: ...ESIE11 02 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 198: ...Test Run and Operation Data ESIE11 02 4 32 Part 4 Commissioning and Test Run 3 1 4 5...
Page 200: ...ESIE11 02 5 2 Part 5 Maintenance 3 1 5...
Page 210: ...ESIE11 02 4 Index 3 1 4 5...