9
|
Electrical installation
Installer reference guide
102
EPRA14~W1 + ET9W
Daikin Altherma 3 H HT F
4P644739-1 – 2021.02
B
A
B
21 28
X2M
B
21 29
X2M
NO
NC
3
Fix the cable with cable ties to the cable tie mountings.
9.3.4 To connect the electricity meters
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied by PCB)
[9.A]
Energy metering
INFORMATION
In case of an electricity meter with transistor output, check the polarity. The positive
polarity MUST be connected to X5M/6 and X5M/4; the negative polarity to X5M/5
and X5M/3.
1
"7.2.5 To open the indoor unit"
55]):
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the electricity meters cable to the appropriate terminals as shown in
the illustration below.
A
6
5
4
3
S3S S2S
Summary of Contents for ETVZ16S18EA6V
Page 270: ...12 12...
Page 271: ......
Page 272: ...4P644739 1 2021 02 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...