12
|
Hand-over to the user
Installer reference guide
247
EPRA14~W1 + ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679467-1 – 2022.02
12 Hand-over to the user
Once the test run is finished and the unit operates properly, please make sure the
following is clear for the user:
▪
Fill in the installer setting table (in the operation manual) with the actual settings.
▪
Make sure that the user has the printed documentation and ask him/her to keep
it for future reference. Inform the user that he can find the complete
documentation at the URL mentioned earlier in this manual.
▪
Explain the user how to properly operate the system and what to do in case of
problems.
▪
Show the user what to do for the maintenance of the unit.
▪
Explain the user about energy saving tips as described in the operation manual.