5
|
Application guidelines
Installer reference guide
31
ERLA EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1A – 2020.05
Example
Single-phase power meter
b
580
1 50
0
0
c
c
f
e
d
A
B
a
A
Outdoor unit
B
Indoor unit
a
Electrical cabinet (L
1
/N)
b
Power meter (L
1
/N)
c
Fuse (L
1
/N)
d
Outdoor unit (L
1
/N)
e
Indoor unit (L
1
/N)
f
Backup heater (L
1
/N)
Exception
▪
You can use a second power meter if:
-
The power range of one meter is insufficient.
-
The electrical meter cannot easily be installed in the electrical cabinet.
-
230 V and 400 V three-phase grids are combined (very uncommon), because of
technical limitations of power meters.
▪
Connection and setup:
-
Connect the second power meter to X5M/3 and X5M/4. See
86].
-
In the software the power consumption data of both meters is added so you do
NOT have to set which meter covers which power consumption. You only need
to set the number of pulses of each power meter.
▪
See
"5.4.4 Preferential kWh rate power supply"
31] for an example with two
power meters.
5.4.4 Preferential kWh rate power supply
General rule
▪
Power meter 1: Measures the outdoor unit.
▪
Power meter 2: Measures the rest (i.e. indoor unit and backup heater).
Setup
▪
Connect power meter 1 to X5M/5 and X5M/6.
▪
Connect power meter 2 to X5M/3 and X5M/4.
See
Summary of Contents for ERLA03DAV3
Page 1: ...Installer reference guide Daikin Altherma 3 R F ERLA03DAV3 EHFZ03S18DJ3V...
Page 182: ...1 7 Field settings table 6 8 2 ID9E51 Applicable units EHFZ03S18DJ3V Notes 4P596829 1 2019 10...
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ...4P596821 1A 2020 05 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...