
Press
▲
or
▼
to select a delay time and then
press
OK
.
Random Start Cool
Programming a time
in this section will produce a random delay
when there is call for cooling. In applications
with multiple cooling systems, this prevents
all systems from activating at the same time,
(thus creating a peak power demand). Press
▲
or
▼
to select a delay time and then press
OK
.
Utility CPP Setting
This section is only applicable if your utility
company is running a Critical Peak Pricing
program that you have agreed to be a part of.
Contact your local electrical utility company for
information about programs in your area.
CPP Response
Your utility may send voluntary events to your
Daikin ENVi thermostat. You can choose to
Always Accept
these events. In which case,
you would just be notified that an event is in
progress. Or if you choose
Ask Me
, when the
Utility issues an event, you will be asked if you
want to participate.
If you do not acknowledge the event prior to the
start, the system will default to yes.
Preferred Strategy
During a Critical Peak Pricing event the Utility
may select an energy saving strategy, or allow
you to use your preferred strategy. Select from
one of the options as your preferred energy
saving strategy to be used during Critical Peak
Pricing events.
23