background image

4 Installation

Installation manual

5

EKCB07CAV3
Daikin Altherma low temperature monobloc control box
4P404075­1 – 2015.03

4.2

Mounting the control box

4.2.1

To install the control box

1

Remove the front plate.

2

Hold the back plate against the wall and mark the fixation points
(2 on the top and 2 at the bottom).

NOTICE

Make sure that the marks (2 by 2) are completely level and
that their dimensions correspond to the figure below.

318 mm

310 mm

3

Drill 4 holes and install 4 plugs (suitable for M5).

4

Put  the  screws  in  the  top  plugs  and  hang  the  box  on  the
screws.

5

Put the screws in the bottom plugs.

6

Fix the 4 screws firmly.

INFORMATION

It  is  possible  to  connect  the  user  interface  to  the  control
box.  For  more  information,  refer  to 

"4.3.5  To  connect  the

user interface" on page 6

.

4.3

Connecting the electrical wiring

DANGER: RISK OF ELECTROCUTION

WARNING

ALWAYS use multicore cable for power supply cables.

4.3.1

About electrical compliance

Equipment  complying  with  EN/IEC  61000­3­12  (European/
International  Technical  Standard  setting  the  limits  for  harmonic
currents  produced  by  equipment  connected  to  public  low­voltage
systems with input current >16 A and ≤75 A per phase.).

4.3.2

To connect the electrical wiring on the
control box

1

Insert the wiring from the bottom of the control box.

2

Make sure the low voltage wiring is located on the right. Route it
through the intake hole and fasten it with cable ties.

a

b

c

a

Low voltage wiring

b

High voltage wiring

c

Main power supply

NOTICE

The  distance  between  the  high  voltage  and  low  voltage
cables should be at least 25 mm.

4.3.3

To connect the control box power supply

1

Connect the power supply cable to the control box.

1 2 3

1 2 3

X8M

X1M

1

GND

2

L

3

N

2

Fix  the  cable  with  cable  ties  to  the  cable  tie  mountings  to
ensure strain relief and to make sure that it does NOT come in
contact with sharp edges.

CAUTION

Do NOT push or place redundant cable length in the unit.

Summary of Contents for EKCB07CAV3

Page 1: ...Installation manual Daikin Altherma low temperature monobloc control box English Installation manual Daikin Altherma low temperature monobloc control box EKCB07CAV3 ...

Page 2: ...ntům u skladu sa slijedećim standardom ima ili drugim normativnim dokumentom ima uz uvjet da se oni koriste u skladu s našim uputama 16 17 18 19 20 21 22 23 24 25 megfelelnek az alábbi szabvány ok nak vagy egyéb irányadó dokumentum ok nak ha azokat előírás szerint használják spełniają wymogi następujących norm i innych dokumentów normalizacyjnych pod warunkiem że używane są zgodnie z naszymi instr...

Page 3: ...ral safety precautions Safety instructions that you must read before installing Paper in the box of the outdoor unit Outdoor unit installation manual Installation instructions Paper in the box of the outdoor unit Control box installation manual Installation instructions Paper in the box of the control box Option box installation manual Installation instructions Paper in the box of the option box B...

Page 4: ... power supply voltage free contact 2 d 5 Backup heater kit thermistor 2 e 6 Backup heater kit thermal protector 2 e 7 Backup heater kit connection from control box 2 3V3 3 6V3 6W1 9W1 e Item Description Wires Maximum running current 8 3 way valve 3 f 9 Power supply for booster heater and thermal protection from control box 4 GND a 10 Power supply for booster heater to control box 2 GND 13 A 11 Dom...

Page 5: ... use multicore cable for power supply cables 4 3 1 About electrical compliance Equipment complying with EN IEC 61000 3 12 European International Technical Standard setting the limits for harmonic currents produced by equipment connected to public low voltage systems with input current 16 A and 75 A per phase 4 3 2 To connect the electrical wiring on the control box 1 Insert the wiring from the bot...

Page 6: ...user interface cable to control box terminals X2M 20 21 Route the cable from the right hand side of the terminals fasten it to the cable tie mountings and route it through the hole of the low voltage wiring Onto control box In the room 2 Connect the control box to the outdoor unit Fix the cable with cable ties to the cable tie mountings X5M 20 21 1 2 X2M 3 Insert a screwdriver into the slots under...

Page 7: ...4C From the top a b PCB b 1 4D From the top centre a PCB b b 1 a Notch this part for the wiring to pass through with nippers etc b Secure the wiring to the front part of the casing using the wiring retainer and clamp 5 Starting up the system For instructions on how to configure and commission the system and hand it over to the user refer to the installation manual of the outdoor unit ...

Page 8: ...4P404075 1 2015 03 Copyright 2015 Daikin ...

Reviews: