In heavy snowfall areas it is very important to select an installation site where the
snow will NOT affect the unit. If lateral snowfall is possible, make sure that the heat
exchanger coil is NOT affected by the snow. If necessary, install a snow cover or
shed and a pedestal.
7.2 Mounting the outdoor unit
7.2.1 About mounting the outdoor unit
When
You have to mount the outdoor unit before you can connect the water piping.
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1
Providing the installation structure.
2
Installing the outdoor unit.
3
Providing drainage.
4
Preventing the unit from falling over.
5
Protecting the unit against snow and wind by installing a snow cover and baffle
plates. See
"7.1 Preparing the installation site"
7.2.2 Precautions when mounting the outdoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"2 General safety precautions"
▪
"7.1 Preparing the installation site"
7.2.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
This topic shows different installation structures. For all, use 4 sets of M8 or M10
anchor bolts, nuts and washers. In any case, provide at least 300 mm of free space
below the unit. Additionally, make sure the unit is positioned at least 100 mm
above the maximum expected level of snow.
INFORMATION
The maximum height of the upper protruding part of the bolts is 15 mm.
Summary of Contents for EBLA04E2V3
Page 280: ...14 14 ...
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ...4P685228 1A 2022 05 Copyright 2022 Daikin Verantwortung für Energie und Umwelt ...