General Specification
www.DaikinApplied.com 31
CAT 258 • REBEL APPLIED ROOFTOP
General Specification
PART 1: GENERAL
1 .01 Section Includes:
A.
Semi-custom packaged rooftop air conditioners
1 .02 References
A.
AFBMA 9 - Load ratings and fatigue life for ball
bearings.
B.
AMCA 99 - Standards handbook.
C.
AMCA 210 - Laboratory methods of testing fans for
rating purposes.
D.
AMCA 300 - Test code for sound rating air moving
devices.
E.
AMCA 500 - Test methods for louver, dampers, and
shutters.
F.
AHRI Standard 340/360- Unitary large equipment
G.
AHRI Standard 920 - DOAS
H. AHRI Standard 1060 - Rating air-to-air heat
exchangers for energy recovery ventilation
equipment
I.
ASTM B117 - Standard practice for operating salt
spray apparatus.
J.
NEMA MG1 - Motors and generators.
K. NFPA 70 - National Electrical Code.
L.
UL 723 - Test for surface burning characteristics of
building materials.
M.
UL 900 - Test performance of air filter units.
N.
UL 1995 - Standard for heating and cooling
equipment.
O.
UL 94 - Test for flammability of plastic materials for
parts in devices and appliances.
P.
IBC 2000, 2003 - International Building Code.
Q.
NFPA 90A - Standard for the installation of air
conditioning and ventilating systems.
R.
NFPA 5000 - Building construction and safety code.
S. ASHRAE 90.1 Energy Code.
T.
ASHRAE Std. 111 - Measurement, testing, adjusting,
and balancing of building hvac systems
1 .03 Submittals
A.
Shop drawings: Indicate assembly, unit dimensions,
weight loading, required clearances, construction
details, field connection details, electrical
characteristics and connection requirements.
B. Product data:
1.
Provide literature that indicates dimensions,
weights, capacities, ratings, and electrical
characteristics and connection requirements.
2.
Provide data on filter media, filter performance,
filter assembly, and filter frames.
3.
Provide computer generated fan curves with
specified operating point clearly plotted.
C.
Manufacturers must clearly define any exceptions
made to plans and specifications. Any deviations in
layout, arrangement, or efficiency shall be submitted
to the consulting engineer prior to bid date.
Acceptance of deviation (s) from specifications shall
be in the form of written approval from the consulting
engineer.
1 .04 Operation and Maintanence Data
A.
Maintenance data: provide instructions for
installation, maintenance and service
1 .05 Qualifications
A.
Manufacturer: company specializing in
manufacturing the products specified in this section
with minimum five years documented experience,
who issues complete catalog data on total product.
B.
Certify packaged rooftop performance in accordance
with AHRI 340/360 standards
C.
Product energy efficiency compliant with ASHRAE
90.1 minimum energy efficiency requirements
D.
Startup must be done by trained personnel
experienced with rooftop equipment.
E.
Do not operate units for any purpose, temporary
or permanent, until ductwork is clean, filters and
remote controls are in place, bearings lubricated,
and manufacturers’ installation instructions have
been followed.
1 .06 Delivery, Storage, and Handling
A.
Deliver, store, protect and handle products to site.
B.
Handle carefully to avoid damage to components,
enclosures, and finish
C.
Store in a clean, dry place to protect from weather
and construction traffic.
Summary of Contents for DPSA
Page 41: ......