DCC601A51
intelligent Tab Controller
4P420109-1 – 2015.10
Installer reference guide
4
Schematic setup of the intelligent Tab Controller
a
WAGO power supply unit
b
CPU module
c
I/O module
d
Optional Daikin-supplied tablet
e
Computer with connection to the cloud
f
Cloud
g
LAN gateway (optional Daikin-supplied router)
h
Outdoor unit connected to DIII-NET
i
Indoor unit connected to DIII-NET
j
Forced stop contact input
k
Digital inputs (can be configured as contact inputs or pulse
inputs)
l
Wired remote controller
*
This is a conceptual wiring diagram, for the correct wiring
of the Di1~Di4 terminals, refer to
input and output devices" on page 8
USB
230 V AC
RJ-45
F1, F2 P1, P2
F1, F2 P1, P2
F1, F2 P1, P2
F1, F2
OUT
IN
F1, F2
http://cloud.daikineurope.com
DIII-NET
POWER
I/O IF
CPU IF
LAN
F1/F2
Di1~Di4
d
e
f
i
i
i
h
j*
k*
24 V DC
c
b
g
a
l
l
+ + - -
L N