![background image](http://html1.mh-extra.com/html/daikin/comfora-arxp20l/comfora-arxp20l_service-manual_2460461083.webp)
3
|
Components
Service manual
83
ATXP20~35 + FTXP20~71 + ARXP20~35 + RXP20~71
Split Comfora R32
ESIE18-01D – 2022.02
Is the problem solved?
Action
No
Return to
main PCB and continue with the next
procedure.
3.7 Inverter PCB
3.7.1 Checking procedures
As the inverter PCB is integrated in the main PCB of the unit, see
85] for the other check procedures.
To perform an electrical check of the inverter PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
1
Open the compressor insulation.
DANGER: RISK OF ELECTROCUTION
Wait for at least 10 minutes after the circuit breaker has been turned OFF, to be sure
the rectifier voltage is below 10 V DC before proceeding.
2
Remove the cover of the compressor wire terminals.
3
Disconnect the wiring from the compressor wire terminals U, V and W.
INFORMATION
Note the position of the Faston connectors on the compressor wire terminals to
allow correct connection during installation.
Connect the Faston connectors to the Inverter Analyzer (SPP number 2238609).
4
Turn ON the power of the unit.
5
Use the remote control to activate the inverter test:
Summary of Contents for Comfora ARXP20L
Page 170: ......
Page 171: ......
Page 172: ...ESIE18 01D 2022 02 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...