![background image](http://html.mh-extra.com/html/daikin/atxq25amv1b/atxq25amv1b_installers-reference-manual_501400017.webp)
4
|
About the box
Installer reference guide
17
35AMV1B35AMV1B
Daikin room air conditioner
4P513661-10K – 2021.07
4 About the box
4.1 Overview: About the box
This chapter describes what you have to do after the box with the indoor unit is
delivered on-site.
It contains information about:
▪
Unpacking and handling the unit
▪
Removing the accessories from the unit
Keep the following in mind:
▪
At delivery, the unit MUST be checked for damage. Any damage MUST be
reported immediately to the claims agent of the carrier.
▪
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
▪
When handling the unit, take into account the following:
Fragile, handle the unit with care.
Keep the unit upright in order to avoid damage.
▪
Prepare the path along which you want to bring the unit inside in advance.
4.2 Indoor unit
4.2.1 To unpack the indoor unit
1
2
3
3
4
4.2.2 To remove the accessories from the indoor unit
1
Remove:
▪
the accessory bag located at the bottom of the package,
▪
the mounting plate attached to the back of the indoor unit.