
Si041255EH
Electrical Box
Removal Procedure
7
6. Electrical Box
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1
Remove the screw and
remove the service
cover.
2
Remove the screw and
remove the drip proof
plate.
3
4
5
6
Pull out the indoor heat
exchanger thermistor.
Remove the screw of
the earth / ground wire.
Remove the screw of
the wire fixture.
Remove the 4 screws
of the connecting wires.
Be careful not to lose the clip
of the thermistor.
Service cover
(R17675)
Drip proof
plate
(R11343)
Indoor heat exchanger thermistor
Earth / ground wire
Connecting
wire
Wire
fixture
(R18966)
Clip
(R11268)