![Daikin ARXF20C5V1B Installer'S Reference Manual Download Page 47](http://html.mh-extra.com/html/daikin/arxf20c5v1b/arxf20c5v1b_installers-reference-manual_501314047.webp)
9
|
Finishing the outdoor unit installation
Installer reference guide
47
(A)RXF20~42C5V1B
R32 split series
4P519439-10J – 2021.06
9 Finishing the outdoor unit installation
9.1 To finish the outdoor unit installation
NOTICE
It is recommended that the refrigerant piping between indoor and outdoor unit is
installed in a ducting or the refrigerant piping is wrapped with finishing tape.
1
Insulate and fix the refrigerant piping and cables as follows:
g
b
a
f
e
c
d
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Field wiring (if applicable)
e
Liquid pipe
f
Liquid pipe insulation
g
Finishing tape
2
Install the service cover.
9.2 To close the outdoor unit
NOTICE
When closing the outdoor unit cover, make sure that the tightening torque does NOT
exceed 1.3 N•m.
1×
2
1
1