background image

10

LIQUID PRESSURE

SATURATED LIQUID 

TEMPERATURE °F

PSIG

R-410A

200

70

210

73

220

76

225

78

235

80

245

83

255

85

265

88

275

90

285

92

295

95

305

97

325

101

355

108

375

112

405

118

415

119

425

121

435

123

445

125

475

130

500

134

525

138

550

142

575

145

600

149

625

152

SATURATED LIQUID PRESSURE 

TEMPERATURE CHART

Table 6

8  Condensate Drain Lines

The coil drain pan has a primary and a secondary drain 

with 3/4” NPT female connections. The connectors required 

are 3/4” NPT male, either PVC or metal pipe, and should 

be hand tightened to a torque of no more than 37 in-lbs. to 

prevent damage to the drain pan connection. An insertion 

depth of approximately 3/8” to 1/2” (3-5 turns) should be 

expected at this torque. 

1.  Ensure drain pan hole is not obstructed.

2.  To prevent potential sweating and dripping on to 

finished space, it may be necessary to insulate the 

condensate drain line located inside the building. Use 

Armaflex® or similar material.

A secondary condensate drain connection has been 

provided for areas where the building codes require it. 

Pitch all drain lines a minimum of 1/4” per foot to provide 

free drainage. Provide required support to the drain line to 

prevent bowing.  

If the secondary drain line is required, run the line 

separately from the primary drain and end it where 

condensate discharge can be easily seen.

NOTE: Water coming from secondary line means the 

coil primary drain is plugged and needs immediate 

attention. 

CAUTION

If secondary drain is not installed, the secondary access must 

be plugged.

Insulate drain lines located inside the building or above 

a finished living space to prevent sweating. Install a 

condensate trap to ensure proper drainage. 

NOTE: When units are installed above ceilings, or 

in other locations where damage from condensate 

overflow may occur, it is MANDATORY to install a field 

fabricated auxiliary drain pan under the coil cabinet 

enclosure. 

The installation must include a “P” style trap that is located 

as close as is practical to the evaporator coil. See Figure 

12 for details of a typical condensate line “P” trap.

NOTE: Units operating in high static pressure 

applications may require a deeper field constructed 

“P” style trap than is shown in Figure 12 to allow 

proper drainage and prevent condensate overflow.

Air Handler

2.75" MIN.

POSITIVE LIQUID

SEAL REQUIRED

AT TRAP

Drain

Connection

2" MIN.

Figure 11

NOTE: Trapped lines are required by many local 

codes. In the absence of any prevailing local codes, 

please refer to the requirements listed in the Uniform 

Mechanical Building Code.

A drain trap in a draw-through application prevents air 

from being drawn back through the drain line during fan 

operation thus preventing condensate from draining, and 

if connected to a sewer line to prevent sewer gases from 

being drawn into the airstream during blower operation. 

Use of a condensate removal pump is permitted when 

necessary. This condensate pump should have provisions 

for shutting off the control voltage should a blocked drain 

occur. A trap must be installed between the unit and the 

condensate pump. 

Summary of Contents for AMST U1400 Series

Page 1: ...ice Inspection 12 12 2 Wire Sizing 12 12 3 Maximum Overcurrent Protection MOP 12 12 4 Electrical Connections Supply Voltage 13 12 4 1 Air Handler Only Non Heat Kit Models 13 12 4 2 Air Handler Non Cir...

Page 2: ...d the danger of CO poisoning which can occur if a carbon monoxide producing device con nues to operate in the enclosed area Carbon monoxide emissions can be re circulated throughout the structure if t...

Page 3: ...Shipping Material Removal IMPORTANT All Shipping Material used to protect the equipment and the equipment s components during transit should be removed before final installation 2 3 1 Blower Support...

Page 4: ...stall units such that a positive slope in condensate line 1 4 per foot is allowed 5 5 Horizontal Applications If installed above a finished living space a secondary drain pan as required by many build...

Page 5: ...LUG KIT Table 1 SIDE DRAIN PAN DPK1 DRAIN PLUG COIL ACCESS PANEL MAIN DRAIN PAN Drain Pan Figure 1 1 Side Drain Pan Removal Figure 2 6 2 Horizontal Left Installation Figure 5 No field modifications ar...

Page 6: ...available through your local distributor The kits are not supplied with the air handler and must be used to assist with condensation management in humid environment applications The individual instal...

Page 7: ...ssemblies NOTE The use of a heat shield is strongly recommended when brazing to avoid burning the serial plate or the finish of the unit Heat trap or wet rags must be used to protect heat sensitive co...

Page 8: ...ng Panel Internal Part Terminology Figure 7 External Part Terminology Figure 8 Coil Installation For Downflow Figure 9 Access Panel Configuration for Downflow or Horizontal Right Figure 10 Important N...

Page 9: ...d superheat of 8 F 1 F If subcooling and superheat are low adjust TXV to 8 F 1 F superheat then check subcooling a If subcooling is low and superheat is high add charge to raise subcooling to 8 F 1 F...

Page 10: ...ttention CAUTION If secondary drain is not installed the secondary access must be plugged Insulate drain lines located inside the building or above a finished living space to prevent sweating Install...

Page 11: ...dimension must be less than 23 x20 filter can be installed on a B C and D cabinet respectively the cabinet size is the seventh letter of the model number 11 Electric Heat Refer to the installation man...

Page 12: ...In Canada electrical grounding is to be in accordance with the Canadian Electric Code CSA C22 1 12 1 Building Electrical Service Inspection This unit is designed for single phase electrical supply onl...

Page 13: ...C approved strain relief is to be used at this entry point Some codes municipalities require the supply wire to be enclosed in conduit Consult your local codes Side of Cabinet Top of Cabinet KNOCK OUT...

Page 14: ...tdoor section is single stage or two stage The 24V control voltage connects the air handler to the room thermostat and condenser Low voltage wiring must be copper conductors A minimum of 18AWG must be...

Page 15: ...BK T1 T3 Tap 8 BK PU BK T1 T4 Tap 9 BK PU BK T1 T5 Table 13 Speed Taps 6 9 Wiring Figure 14 12 6 3 AMST60DU1400 ONLY For high static applications no speed tap or airflow modifications should be made f...

Page 16: ...tened All panels must be in place and secured For Air Tight application gasket must be positioned at prescribed locations to achieve 1 4 leakage Tubing must be leak free Condensate line must be trappe...

Page 17: ...95 625 615 515 T9 995 970 925 910 860 850 800 790 730 T1 750 725 670 655 585 570 465 455 360 T2 920 895 845 830 780 770 710 700 615 T3 985 960 915 900 850 840 785 775 710 T4 1185 1165 1125 1115 1070 1...

Page 18: ...T2 1580 1550 1490 1470 1400 1390 1315 1305 1230 T3 1635 1610 1560 1545 1480 1470 1400 1390 1315 T4 1851 1810 1768 1733 1704 1662 1613 1486 1358 T5 1820 1795 1750 1735 1680 1670 1605 1595 1525 T6 1465...

Page 19: ...the connections between room thermostat and the air handlers and the connections between the air handlers and the Condensing Unit or Heat Pump with optional connections to Outdoor Thermostats For eac...

Page 20: ...UNIT 24V CONNECTION BL YL YL WH GR RD 18 GA 4 WIRES WITH COOLING 3 WIRES WITHOUT AIR HANDLER Y G W W2 R COOLING UNIT WITH OPTIONAL HEAT KITS OF 15 kW AND ABOVE AND ROOM THERMOSTAT WITH TWO STAGES OF H...

Page 21: ...EMOVE WIRE WHEN USING OUTDOOR THERMOSTAT NOMENCLATURE OT OUTDOOR THERMOSTAT OPTIONAL EHR EMERGENCY HEAT RELAY OPTIONAL COLOR CODES RD RED YL YELLOW BL BLUE BR BROWN OR ORANGE WH WHITE G C R HEAT PUMP...

Page 22: ...PLUG CONNECTOR TRANSFORMER HIGH VOLTAGE LOW VOLTAGE HIGH VOLTAGE LOW VOLTAGE PLF 2 COLOR CODE TR 6 5 PLM 4 4 24V 5 1 2 3 EM WIRING CODE 208 240 VOLTS 1 1 PLF PLM L1 PLM 2 L2 IF REPLACEMENT OF THE ORI...

Page 23: ...AGE HIGH VOLTAGE LOW VOLTAGE PLF 2 COLOR CODE TR 6 5 PLM 4 4 24V 5 1 2 3 EM WIRING CODE 208 240 VOLTS 1 1 PLF PLM L1 PLM 2 L2 IF REPLACEMENT OF THE ORIGINAL WIRES SUPPLIED WITH THIS ASSEMBLY IS NECESS...

Page 24: ...am on the unit for the most up to date wiring 3 Phase Heat Kit 18 Wiring Diagrams HIGH VOLTAGE DISCONNECT ALL POWER BEFORE SERVICING OR INSTALLING THIS UNIT MULTIPLE POWER SOURCES MAY BE PRESENT FAILU...

Page 25: ...icals can cause premature aluminum evaporator coil failure Any cleaners that contain corrosive chemicals including but not limited to chlorine and hydroxides should not be used An alternate cleaning m...

Page 26: ...WB F DB F WB F Heating Supply Air Temperature DB F Temperature Rise DB F Delta T Difference between Supply and Return Temperatures DB F AirHandler Coil InverterMatched INVERTERAH COILONLY Check EEV an...

Page 27: ...27 THIS PAGE IS INTENTIONALLY LEFT BLANK...

Page 28: ...REGISTRATION Thank you for your recent purchase Though not required to get the protection of the standard warranty registering your product is a relatively short process and entitles you to additional...

Reviews: