6 Commissioning
Installation manual
24
08S18+23DA
Daikin Altherma – Low temperature split
4P495245-1B – 2017.12
6
Go to [8.4.A]: Information > Sensors > Flow rate.
7
Modify the bypass valve setting to reach the
minimum required flow rate + 2 l/min.
—
Minimum required flow rate during defrost/backup heater
operation
12 l/min
6.2.2
To perform an air purge
Conditions:
Make sure all operation is disabled. Go to the
Operation menu and turn off Room, Space heating/cooling and Tank
operation.
1
Set the user permission level to Installer. See
"To
change the user permission level" on page 16
.
—
2
Go to [A.3]: Commissioning > Air purge.
3
Select OK to confirm.
Result:
The air purge starts. It stops automatically
when air purge cycle is finished.
To stop the air purge manually:
—
1
Go to Stop air purge.
2
Select OK to confirm.
INFORMATION
For both manual and automatic air purge, 1 temperature
zone is purged with each air purge start. To purge the
other temperature zone, you have to restart the air purge
function. When performing an air purge for the first time,
the main temperature zone will be purged.
6.2.3
To perform an operation test run
Conditions:
Make sure all operation is disabled. Go to the
Operation menu and turn off Room, Space heating/cooling and Tank
operation.
INFORMATION
The test run only applies to the additional temperature
zone.
1
Set the user permission level to Installer. See
"To
change the user permission level" on page 16
.
—
2
Go to [A.1]: Commissioning > Operation test run.
3
Select a test from the list.
Example:
Heating.
4
Select OK to confirm.
Result:
The test run starts. It stops automatically
when done (±30 min).
To stop the test run manually:
—
1
Go to Stop test run.
2
Select OK to confirm.
If the installation of the unit has been done correctly, the unit will
start up during test operation in the selected operation mode. During
test mode, the correct operation of the unit can be checked by
monitoring its leaving water temperature (heating/cooling mode) and
tank temperature (domestic hot water mode).
To monitor the temperature:
1
Go to Sensors.
2
Select the temperature information.
6.2.4
To perform an actuator test run
Conditions:
Make sure all operation is disabled. Go to the
Operation menu and turn off Room, Space heating/cooling and Tank
operation.
Purpose of the actuator test run is to confirm the operation of the
different actuators (e.g., when you select Pump, a test run of the
pump will start).
1
Set the user permission level to Installer. See
"To
change the user permission level" on page 16
.
—
2
Go to [A.2]: Commissioning > Actuator test run.
3
Select a test from the list.
Example:
Pump.
4
Select OK to confirm.
Result:
The actuator test run starts. It stops
automatically when done (±30 min).
To stop the test run manually:
—
1
Go to Stop test run.
2
Select OK to confirm.
Possible actuator test runs
▪ Backup heater 1 test
▪ Backup heater 2 test
▪ Pump test
INFORMATION
Make sure that all air is purged before executing the test
run. Also avoid disturbances in the water circuit during the
test run.
▪ Shut off valve test
▪ Diverter valve test
▪ Bivalent signal test
▪ Alarm output test
▪ C/H signal test
▪ DHW pump test
6.2.5
To perform an underfloor heating screed
dryout
Conditions:
Make sure all operation is disabled. Go to the
Operation menu and turn off Room, Space heating/cooling and Tank
operation.
1
Set the user permission level to Installer. See
"To
change the user permission level" on page 16
.
—
2
Go to [A.4]: Commissioning > UFH screed dryout.
3
Set a dryout program: go to Program and use the
UFH screed dryout programming screen.
4
Select OK to confirm.
Result:
The underfloor heating screed dryout starts.
It stops automatically when done.
To stop the test run manually:
—
1
Go to Stop UFH screed dryout.
2
Select OK to confirm.
NOTICE
To perform an underfloor heating screed dryout, room frost
protection needs to be disabled ([2‑06]=0). By default, it is
enabled ([2‑06]=1). However, due to the "installer-on-site"
mode (see "Checklist before commissioning"), room frost
protection will be automatically disabled for 36 hours after
the first power-on.
If the screed dryout still needs to be performed after the
first 36 hours of power-on, manually disable room frost
protection by setting [2‑06] to "0", and KEEP it disabled
until the screed dryout has finished. Ignoring this notice will
result in cracking of the screed.