![Daikin Altherma EAVZ16S18DA6V Installer'S Reference Manual Download Page 61](http://html.mh-extra.com/html/daikin/altherma-eavz16s18da6v/altherma-eavz16s18da6v_installers-reference-manual_501240061.webp)
8
|
Piping installation
Installer reference guide
61
EPGA11~16DAV3(7) + EA23DA6V(7)+9W
Daikin Altherma 3 H F
4P556075-1A – 2021.09
89°C
75°C
M
M
a
b
c
d
g
e
h
i
i
i
j
j
f
k
i
HPC1
FHL1
FHL2 FHL3
HPC2
HPC3
a
Outdoor unit
b
Indoor unit
c
Heat exchanger
d
Backup heater
e
Motorised 3‑way valve (switch between space heating and domestic hot water)
f
Motorised 3‑way valve (mixing the main zone)
g
Main pump
h
Additional pump
i
Shut-off valve
j
Collector (field supply)
k
Domestic hot water tank
HPC1...3
Heat pump convector (field supply)
FHL1...3
Floor heating loop (field supply)
▪
Drainage – Low points.
Provide drain taps at all low points of the system in order
to allow complete drainage of the water circuit.
▪
Drainage – Pressure relief valve.
Connect the drain hose properly to the drain to
avoid water dripping out of the unit. See
"7.4.4 To connect the drain hose to the
57].
▪
Air vents.
Provide air vents at all high points of the system, which must also be
easily accessible for servicing. Two automatic air purges are provided in the
indoor unit. Check that the air purges are NOT tightened too much, so that
automatic release of air in the water circuit is possible.
▪
Zn-coated parts.
NEVER use zinc coated parts in the water circuit. Because the
internal water circuit of the unit uses copper piping, excessive corrosion may
occur.
▪
Non-brass metallic piping.
When using non-brass metallic piping, insulate the
brass and non-brass properly so that they do NOT make contact with each other.
This to prevent galvanic corrosion.
▪
Valve – Change‑over time.
When using a 2-way valve or a 3-way valve in the
water circuit, the maximum change-over time of the valve must be 60 seconds.
▪
Domestic hot water tank – Capacity.
To avoid stagnation of water, it is
important that the storage capacity of the domestic hot water tank meets the
daily consumption of domestic hot water.
▪
Domestic hot water tank – After installation.
Immediately after installation, the
domestic hot water tank must be flushed with fresh water. This procedure must
be repeated at least once a day the first 5 consecutive days after installation.
▪
Domestic hot water tank – Standstills.
In cases where during longer periods of
time there is no consumption of hot water, the equipment MUST be flushed with
fresh water before usage.
Summary of Contents for Altherma EAVZ16S18DA6V
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ...4P556075 1A 2021 09 Copyright 2018 Daikin Verantwortung für Energie und Umwelt ...