9
|
Electrical installation
Installer reference guide
124
EPRA08~W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1 – 2021.07
2
Connect both connection cables from the backup heater EKECBU* to the
appropriate connectors as shown in the illustration below.
3
Fix the cable with cable ties to the cable tie mountings. General information,
see
"9.3.1 To connect the electrical wiring to the indoor unit"
9.3.5 To connect the shut-off valve
INFORMATION
Shut-off valve usage example.
In case of one LWT zone, and a combination of
underfloor heating and heat pump convectors, install a shut-off valve before the
underfloor heating to prevent condensation on the floor during cooling operation.
For more information, see the installer reference guide.
Wires: 2×0.75 mm²
Maximum running current: 100 mA
230 V AC supplied by PCB
[2.D]
Shut off valve
1
"7.2.5 To open the indoor unit"
72]):
1
User interface panel
1
3
4
2
2
Switch box
3
Switch box cover
4
Top cover
2
Connect the valve control cable to the appropriate terminals as shown in the
illustration below.
NOTICE
Wiring is different for a NC (normally closed) valve and a NO (normally open) valve.
Summary of Contents for Altherma 3 H MT ECH2O
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ...4P663478 1 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...