7
|
Piping installation
Installer reference guide
80
EPRA14~W1 + ETVH/9W(G)
Daikin Altherma 3 H HT F
4P587502-1B – 2020.12
c
a
b
b
d
1
2
a
Water OUT (screw connection, male, 1")
b
Water IN (screw connection, male, 1")
c
Shut-off valve with integrated filter (delivered as accessory)(2× screw connection,
female, 1")
d
Thread sealant
2
Connect the field piping to the shut-off valve.
3
Connect the field piping to the outdoor unit water outlet.
NOTICE
About the shut-off valve with integrated filter (delivered as accessory):
▪
The installation of the valve at the water inlet is mandatory.
▪
Mind the flow direction of the valve.
NOTICE
Install air purge valves at all local high points.
Indoor unit
1
Connect the O-rings and shut-off valves to the outdoor unit water connection
pipes of the indoor unit.
2
Connect the outdoor unit field piping to the shut-off valves.
3
Connect the O-rings and shut-off valves to the space heating/cooling water
pipes of the indoor unit.
4
Connect the space heating/cooling field piping of both zones to the shut-off
valves.
5
Connect the domestic hot water in and out pipes to the indoor unit.
b1
b2
a1
a2
c2
c1
a1
Space heating/cooling – Water IN (screw connection, 1")
a2
Space heating/cooling – Water OUT (screw connection, 1")
b1
DHW – Cold water IN (screw connection, 3/4")