AHT Cooling Systems GmbH | en
Setup and installation | 8
417632_2_0820
45 / 84
Communication interface
The appliance features a communication interface
(bus connection). This interface can be used to con-
nect the appliance to a monitoring system.
Several appliances can be interconnected via the
communication interface. Depending on the appliance
type and configuration, it may be necessary to inter-
connect several appliances.
NOTICE
Material and property damage due to faulty
communication between appliances and with
the monitoring system.
§
Never break an existing bus connection.
The signal to activate daytime/night-time operation is
transmitted to the appliance via the communication in-
terface.
Do not cover the temperature display, safety notes, or
the rating plate
.
WARNING
Appliance tipping hazard.
Persons may become trapped.
§
Remove the transport frames only when in
the stable and final installation position.
§
Observe the separate assembly instruc-
tions.
§
In the event of questions, contact the
maintenance service
Installing the display shelves and mesh
baskets
1
2
3
4
Fig. 6:
Display shelf (1) with bracket (2), mesh basket (3)
with removable bracket (4)
Responsibility
– Operating company
CAUTION
Incorrect installation of the display
shelves or mesh baskets.
Risk of injury due to falling of the display
shelves holding goods or the mesh baskets.
§
The brackets for display shelves must
snap completely into the openings
provided when being attached.
§
The brackets for mesh baskets must snap
completely into the openings provided
when being attached.
§
Note installation of the display shelves or
mesh baskets
[see
.
NOTICE
Material damage due to deformation of the
display shelves or mesh baskets.
§
Align the brackets in parallel.
§
Align the display shelves horizontally.
§
Align the mesh baskets horizontally.
§
Insert the display shelves at the same height.
§
Insert the mesh baskets at the same height.
§
Install the appliance rear panel correctly with dis-
play shelves.
§
The appliance side panel and side display shelf
must be present.
Number and position of display shelves and mesh
baskets
– Loading specification drawing:
[see
.
Installing the display shelves
a) Attach the brackets for the display shelves to the
openings in the rear panel.
1
2
Fig. 7:
Attach bracket (1) – opening in rear panel (2)
b) Attach display shelf to opening in bracket.
2
1
Fig. 8:
Attach display shelf (1) to bracket (2)
Installing the mesh baskets
c) Attach the removable brackets for the mesh bas-
kets to the openings in the rear panel.