background image

10 Commissioning

Installation manual

18

2MXM-A, 3MXM-A, 4MXM-A, 5MXM-A

R32 Split series

3P600450-6M – 2021.12

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

10.1

Checklist before commissioning

1

After the installation of the unit, check the items listed below.

2

Close the unit.

3

Power up the unit.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

The indoor unit receives the signals of the 

user interface

.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The 

fuses, circuit breakers,

 or locally installed protection

devices  are  installed  according  to  this  document,  and
have NOT been bypassed.

Check  if  marks  (room  A~E)  on  the  wiring  and  piping
match for each indoor unit.

Check  if  the  priority  room  setting  is  set  for  2  or  more
rooms. Keep in mind that the DHW generator for Multi or
the  Hybrid  for  Multi  shall  not  be  selected  as  the  priority
room.

10.2

Checklist during commissioning

To perform a 

wiring

 check.

To perform an 

air purge

.

To perform a 

test run

.

10.3

Trial operation and testing

For  the  Hybrid  for  Multi,  certain  precautions  are  required  before
using  this  function.  For  more  information,  see  the  indoor  unit
installation manual and/or the indoor installer reference guide.

Before  starting  the  test  run,  measure  the  voltage  at  the
primary side of the 

safety breaker

.

The 

piping and wiring work

 match.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

Initialization of the Multi system can take several minutes depending
on the number of indoor units and options used.

10.3.1

About wiring error check

The  wiring  error  check  function  will  check  and  automatically  correct
any wiring errors. This is useful for checking wiring that CANNOT be
checked directly, such as underground wiring.

This function CANNOT be used within 3 minutes after activating the
safety breaker or when the outside air temperature is ≤5°C.

To perform a wiring error check

INFORMATION

▪ You only have to perform a wiring error check if you are

not  sure  that  the  electrical  wiring  and  piping  is
connected correctly.

▪ If you perform a wiring error check, the hybrid for multi

indoor unit will not operate by heat pump for 72 hours.
During this time, the gas boiler will take over the hybrid
operation.

1

Remove the service PCB switch cover.

1

A

1
2
3
4
5

SW3

2

2

Press  shortly  the  wiring  error  check  switch  (SW3)  on  the
outdoor unit service PCB.

Result: 

The  service  monitor  LEDs  indicate  whether  correction

is  possible  or  not.  For  details  about  how  to  read  the  LED
display, refer to the service manual.

Result: 

Wiring  errors  will  be  corrected  after  15-20  minutes.  If

automatic correction is not possible, check the indoor unit wiring and
piping in the usual way.

INFORMATION

▪ The number of LEDs displayed depends on the number

of rooms.

▪ The wiring error check function will NOT work if outside

temperature is ≤5°C.

▪ After  wiring  error  check  operation  is  completed,  LED

indication will continue until normal operation starts.

▪ Follow the product diagnosis procedures. For details of

product error diagnosis refer to service manual.

Status of LEDs:

▪ All LEDs flash: automatic correction is NOT possible.

▪ LEDs flash alternately: automatic correction is completed.

Summary of Contents for 3MXM40A2V1B

Page 1: ...Installation manual R32 Split series English Installation manual R32 Split series 2MXM68A2V1B 3MXM40A2V1B 3MXM52A2V1B 3MXM68A2V1B 4MXM68A2V1B 4MXM80A2V1B 5MXM90A2V1B...

Page 2: ...ringer Direktiivej sellaisina kuin ne ovat muutettuina v platn m zn n Smjernice kako je izmijenjeno ir nyelv ek s m dos t saik rendelkez seit z p niejszymi poprawkami 18 19 20 21 22 23 24 25 Directive...

Page 3: ...aava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota TS T...

Page 4: ...kuin ne ovat muutettuina v platn m zn n Smjernice kako je izmijenjeno ir nyelv ek s m dos t saik rendelkez seit z p niejszymi poprawkami 18 19 20 21 22 23 24 25 Directivelor cu amendamentele respectiv...

Page 5: ...aava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota TS T...

Page 6: ...mmissioning 18 10 2 Checklist during commissioning 18 10 3 Trial operation and testing 18 10 3 1 About wiring error check 18 10 3 2 To perform a test run 19 10 4 Starting up the outdoor unit 19 11 Mai...

Page 7: ...sor is run air will be sucked in This will cause abnormal pressure in the refrigeration cycle which may result in equipment damage and even injury CAUTION Do NOT open the valves before flaring is comp...

Page 8: ...y is turned off because of high voltage risk Please note that some sections of the electric component box are hot Make sure you do NOT touch a conductive section Do NOT rinse the unit This may cause e...

Page 9: ...ating mode 10 46 C DB 15 24 C DB 4 1 2 Additional installation site requirements of the outdoor unit in cold climates Protect the outdoor unit against direct snowfall and take care that the outdoor un...

Page 10: ...drain socket a c b b b a a a Drain hole Install a drain cap large b Drain hole Install a drain cap small c Drain hole for drain socket 5 Piping installation 5 1 Preparing refrigerant piping 5 1 1 Ref...

Page 11: ...r the refrigerant piping the better the performance of the system The piping length and height differences must comply with the following requirements Shortest allowable length per room is 3 m Outdoor...

Page 12: ...ucer no 1 c Reducer no 3 d Flare nut for 15 9 mm e Inter unit piping Connecting a 9 5 mm pipe to a 15 9 mm gas pipe connection port a b d e c a Outdoor unit connection port b Reducer no 6 c Reducer no...

Page 13: ...e on the manifold indicates 0 1 MPa 1 bar 2 Leave as is for 4 5 minutes and check the pressure If the pressure Then Does not change There is no moisture in the system This procedure is finished Increa...

Page 14: ...ALWAYS use protective gloves and safety glasses Prerequisite Before charging refrigerant make sure the refrigerant piping is connected and checked leak test and vacuum drying 1 Connect the refrigerant...

Page 15: ...epending on the model 7 1 Specifications of standard wiring components Component Power supply cable Voltage 220 240 V Phase 1 Frequency 50 Hz Wire type See table below A Interconnection cable indoor o...

Page 16: ...ng 9 1 1 To turn ON standby electricity saving function Prerequisite The main power supply MUST be turned OFF 1 Remove the service cover 2 Disconnect the selective standby electricity saving connector...

Page 17: ...2 Set the heat mode lock switch SW5 1 to ON 1 1 4 3 2 1 A 1 2 3 4 5 SW5 4 3 2 1 2 OFF ON 9 5 About cool mode lock Cool mode lock limits the unit to cool operation Forced operation remains possible in...

Page 18: ...For more information see the indoor unit installation manual and or the indoor installer reference guide Before starting the test run measure the voltage at the primary side of the safety breaker The...

Page 19: ...of the system 11 Maintenance and service NOTICE General maintenance inspection checklist Next to the maintenance instructions in this chapter a general maintenance inspection checklist is also availa...

Page 20: ...umber of passes through ferrite core PAM Pulse amplitude modulation PCB Printed circuit board Symbol Meaning PM Power module PS Switching power supply PTC PTC thermistor Q Insulated gate bipolar trans...

Page 21: ...A r B s s t t u u d p o o n l l m l w x v A v B v A v B q h 2MXM68 a Heat exchanger k 4 way valve u Thermistor gas b Outdoor air temperature thermistor l Muffler v Room c Heat exchanger thermistor m...

Page 22: ...2 7CuT 12 7CuT 12 7CuT 12 7CuT 15 9CuT 15 9CuT 15 9CuT 7 9CuT 9 5CuT 12 7CuT 7 9CuT 7 9CuT 7 9CuT MV MV MV A B C 6 4CuT 6 4CuT 6 4CuT 6 4CuT 6 4CuT 6 4CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 7 9CuT S1PH d e f...

Page 23: ...5CuT 12 7CuT 7 9CuT 7 9CuT 7 9CuT MV MV MV A B C 6 4CuT 6 4CuT 6 4CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT S1PH SV 9 5CuT 9 5CuT 6 4CuT 12 7CuT 7 9CuT MVD 6 4CuT 15 9CuT 12 7CuT 7 9CuT 7 9CuT 7 9CuT 7 9CuT 7 9...

Page 24: ...12 7CuT 15 9CuT 9 5CuT 9 5CuT 9 5CuT d e f k a a b c g i j d r A r B r C r D r E s t s t s t s t s t v A v A v B v C v D v E v B v C v D v E u u u u u d p o o n l m l l w x q h y y 5MXM90 a Heat excha...

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ...3P600450 6M 2021 12 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...

Reviews: