Installation Preparation 1
1
Installation Preparation
Basic Requirements
1.1
All installation and operation should conform to your local electrical safety regulations, fire
protection regulations, and relevant regulations.
Make sure the application scenarios conform to the installation requirements. Contact your
local retailer or customer service center if there is any problem.
Use the product according to the operating environment.
Keep the original packing material well, you might need it to pack the speed dome and
send it back for repair.
Installation Check
1.2
Make sure the installation environment has enough space to install the speed dome and its
mounting accessories.
Make sure the ceiling and wall can sustain eight times the weight of the speed dome and
its mounting accessories.
Make sure the wall is thick enough to install expansion bolts (The expansion bolts should
be purchased separately).
Cable Preparation
1.3
1.3.1 Minimum Specification Requirements for Cables
75 ohm
Full copper-cored cables
95% knitted copper shield
1.3.2 Power Cord Selection
See Appendix 2 for 12V DC power supply.