background image

 

1 Dimensions 

 

Summary of Contents for ASF172X-T1

Page 1: ...ASF172X T1 Thermal Temperature Station Floor Stand Quick Start Guide V1 0 0 ...

Page 2: ...de or our official website If there is inconsistency between paper manual and the electronic version the electronic version shall prevail All the designs and software are subject to change without prior written notice The product updates might cause some differences between the actual product and the manual Please contact the customer service for the latest program and supplementary documentation ...

Page 3: ... well for future reference Operation Requirement Do not place or install the bracket in a place exposed to sunlight or near the heat source Keep the bracket away from dampness dust or soot Keep the bracket installed horizontally on the stable place to prevent it from falling Operate the bracket within the rated range of power input and output Do not dissemble the bracket Transport use and store th...

Page 4: ...ble of Contents Foreword I Important Safeguards and Warnings II 1 Dimensions 1 2 Installation Guide 2 2 1 Mounting Requirements 2 2 2 Dimensions 3 2 3 Installing the SafetyTemp Temperature Monitoring Kiosk 3 ...

Page 5: ...1 1 Dimensions ...

Page 6: ...nsions L W H of cement sinker are 300 mm x 180 mm x 80 mm 11 81 7 08 3 15 The floor bracket is placed in the center of the cement sinker Use the expansion bolts provided in the package to complete the fixing If the screws are loose it is necessary to complete the on site maintenance in time to prevent the floor bracket from tilting and falling ...

Page 7: ...e short cable with a longer one 3 Flatten the seal ring of the port cover and then fix the port cover with 4 screws 4 Thread the long cable through the bracket and then fix the bracket with 4 anchor screws 5 Attach the kiosk to the bracket 6 Connect cables for the kiosk 7 Put the waterproof plug on the cable and apply silicone sealant to fill gaps 8 Install the rear cover and base cover on the bra...

Reviews: