Installation
Preparation
4.1.1
Installation Site Requirements
The installation site shall meet the requirements of electrical and relevant fire prevention
codes.
Choose an installation site with sufficient sunshine all the year round, and make sure no
shelter around the site to ensure natural lighting.
If there is shelter at the installation site, make sure the lowest installation position of the
System is at least 1 meter above the shelter, otherwise, it will lead to decline in power
generation and battery power loss, which will finally damage the battery.
Avoid public facilities such as underground cables, optical cables to ensure smooth
installation.
Make sure the back side of the System is well-ventilated.
4.1.2
Tools
Tools included in the packing list are provided. Besides, you need to prepare the tools shown
in Figure 4-1.
Tools