
26
1. CIRCUIT CHECK PROCEDURE
1. Low Voltage Transformer check
• The low voltage transformer is located on the P.C.B.
• Measuring condition: input voltage : 230V / Frequency : 50Hz
2. Voltage check
• Key check point
• Check method
NO
CHECK POINT
REMARK
1
IC 1 PIN 5
5 VDC
2
IC 1 PIN 8
3
IC 1 PIN 19 OR PIN 20
NOTE :
Each measure point must be measured with GND points.
NOTE :
1. Refer to Circuit Diagram (point 4).
2. Secondary side voltage of the low voltage transformer changes in proportion to fluctuation of power source voltage.
3. The allowable tolerance of the secondary voltage is within ± 5% of nominal voltage.
Terminal Voltage
(4,5)-6 or (7,8)-6
LOAD
AC 14 V
NO LOAD
AC 17 V
NO
MEASURE POINT
WAVE FORM
REMEDY
REMARK
1
MP1
DC 5V ±0.25V
Replace Q8, R28, ZD3, C2, EC1
NO LOAD
2
MP2
DC 15V ±2.0V
Replace EC3, D11, D12, D13
NO LOAD
PRINTED CIRCUIT BOARD
T
T:20ms(50Hz)
5V
0V
T
T:250ns(4MHz)
5V
0V
Summary of Contents for KOR-6L4B5S69
Page 5: ...4 EXTERNAL VIEW 1 OUTER DIMENSION 446 270 318...
Page 26: ...25 WIRING DIAGRAM...
Page 28: ...27 Measure Point MP1 MP2 GND...
Page 30: ...29 2 PCB CIRCUIT DIAGRAM...