79
Precautions
Items
4) Refrigerant Charging
Charge refrigerant while operating a compressor as shown above.
5) Pinch a charging pipe with a pinch-off plier after completion of charging.
6) Braze the end of a pinched charging pipe with copper brazer and take
a gas leakage test on the welded parts.
4.Refrigerant charging.
Bombe
Compressor
Evaporator
Condenser
Dryer
Hot Pipe
* Take a leakage test on the welded or suspicious area with an
electronic leakage tester.
5. Gas-leakage test
* Check each pipe is placed in its original place before closing
a cover back-M/C after completion of work.
6. Pipe arrangement
in each cycle
10-4. Standard Regulations for Heavy Repair
1) Observe the safety precautions for gas handling.
2) Use JIG (or wet towel) in order to prevent electric wires from burning during welding.
(In order to prevent insulation break and accident.)
3) The inner case shall be melted and insulation material (polyurethane) shall be burnt
if not cared during welding inner case parts.
4) The copper pipe shall be oxidized by overheating if not cared during welding.
5) Not allow the aluminum pipes to contact to copper pipes. (In order to prevent corrosion.)
6) Make sure that the inner diameter should not be distorted while cutting a capillary tube.
7) Be sure that a suction pipe and a filling tube should not be substituted each other during welding.
( High efficiency pump.)
Summary of Contents for FRU-5711-FRS-U20DA Series
Page 4: ...3 2 EXTERNAL VIEWS 2 1 External Size FRS N U20IA...
Page 5: ...4 FRS N U20DA FRS N U20EA...
Page 6: ...5 FRS N U20FA FRS N U20GA...
Page 41: ...40 6 1 Wiring Diagram 6 DIAGRAM FRS N U20IA...
Page 42: ...41 FRS N U20DA EA FA GA...
Page 43: ...42 6 2 Circuit Diagram of Main PCB FRS N U20IA...
Page 44: ...43...
Page 45: ...44 FRS N U20DA EA FA GA...
Page 46: ...45...
Page 88: ...87 11 5 Dispenser Water Flow...