INDEX
1. GENERAL SAFETY RULES
..................................................................................................................... 3
2. INSTALLATION
........................................................................................................................................ 4
3. DIMENSION
............................................................................................................................................. 4
4. MAINTENANCE
....................................................................................................................................... 4
5. TECHNICAL DATA
................................................................................................................................... 6
6. PARTS LIST
............................................................................................................................................. 7
WARRANTY
............................................................................................................................................... 10
1
Congratulation for your excellent choice. Your new electric tool is manufactured in compliance with
the best quality and reliability standards, ensure you efficiency and safety for a long period of time.
1. GENERAL SAFETY RULES
WARNING! Before using this elecric tool, carefully read the general safety rules listed below:
- Your sockets must comply with safety rules.
In case your sockets are not suitable, they should be checked by a skilled electrician.
- Your socket plug must absolutely be grounded and your electric system must be supplied with a
magneto cut-out safety.
- When the machine is running unwatched, be careful that children can’t reach it.
- Do out pull the electric cable to disconnect the plug.
-The machine shall be protected from frost and low temperature.
- In case the machine can not hoist a load, do not keep pressing the hoisting push-button; this
means that the load exceeds the machine maximum capacity.
- The machine shall not be dissembled when running or connected to power.
- The machine shall not be operated when it is raining or storming.
-Do not stand under hoisted weights.
- Before starting the work, make sure that the steel wire cable is correctly winded around the reel
and the pitch is equal to the cable diameter.
- OBSERVE THE MAXIMUM LOAD INDICATED ON TEH HOIST, NOT THAT ON THE HOOK!
- Leave at least three turns of cable around the reel, so tat the cable connection is not under stress.
- To avoid any danger, do not wind more than 15 mt of cable around the reel.
- In case the steel cable is worn out, it must be replaced only with a cable of same featues manufac-
tured by us. It can be found at all authorized service shop.
- Before starting the work, check that switches are in good operation conditions.
- In case the hoist stops during the lowering of a load, it normal that the load goes down a few
centimeters more because of inertia.
- ATTENTION!! THE HOIST ELECTRIC MOTOR IS NOT SUPPLIED WITH OVERLOAD CUT-OUT (TO
AVOID AN UNEXPECTED AND UNWANTED RESTART) THEREFORE, IF YOU ARE UNABLE TO
HOIST A LOAD, DO NOT INSIST AND LET THE MOTOR COOL DOWN.
2.INSTALLATION
The hoist <STANDARD VERSION> is provided with a specially designed bracket system which
allows to hold pipes box.
Check the socket features (volt-hertz) correspond to those indicated on the machine plate; then you
can insert the plug.
In case a cable extension is needed, it is absolutely important to respect the cable’s data.
3.DIMENSION
INSULATION CLASS
Insulation Class: B
Protection Class: IP54
Working System: Intermittent Duty Cycle (S3 20%-10min)
4. MAINTENANCE
- Periodically check that the steel cable is in good conditions.
-Check that the screws securing the brackets and reduction gear are well tightened.
-Check the conditions and tightening of the nuts securing the steel cable clamps.
-Periodically check that motor stop switch and push button switch are in good operating conditions.
-Periodically check whether the wire rope is in good condition. If not, it need to be replaced by
respecting that the following chart.