background image

2. About Circuit Breaker Panel 

V

V

V

Type : 1- or 2- Phase, 3 Wire 

Voltage : V

AN

, V

BN

 = 120V 

               V

AB

 = 208~240V 

Power Source 

Main Circuit Breaker 

Branch Circuit Breakers 

Summary of Contents for Polaris 1500

Page 1: ...DAE Controls LLC Polaris 1500 Installation Guide Ver 1 0us...

Page 2: ...olaris 1500 Installation Guide 1 Before Installation 2 About Circuit Breaker Panel 3 Terminals 4 Mounting Procedure 5 CT Installation 6 Wiring Diagram 7 Meter Installation 8 Before Turning on the Powe...

Page 3: ...dicated CT being used is compatible with the type of Polaris Note that the Polaris cannot be directly used with non DAE dedicated CTs Verify that the current rating of the dedicated CT being used is s...

Page 4: ...2 About Circuit Breaker Panel VA VB VN Type 1 or 2 Phase 3 Wire Voltage VAN VBN 120V VAB 208 240V Power Source Main Circuit Breaker Branch Circuit Breakers...

Page 5: ...VB VC VN Voltage inputs DO DO Reserved DI DI Reserved RLY RLY Reserved P P Reserved RS485 RS485 RS485 S Communications port CT A CT A Phase A CT input CT B CT B Phase B CT input CT C CT C Phase C CT i...

Page 6: ...is wall mounted drill the screw holes according to the diagram below b Place the Polaris flat against the wall aligning the mount holes of the Polaris with the screw holes c Secure the Polaris using...

Page 7: ...r terminal c Put the loading wire through the solid core CT d Make sure the load direction is the same as the direction marked on the CTs e Reconnect the conductor to the breaker or terminal Meter sid...

Page 8: ...6 Wiring Diagram VAN 120V VAN VBN 120V VAB 208 240V 1 Phase 2Wire 1 or 2 Phase 3Wire Please install fuses for the voltage inputs fuse fuse...

Page 9: ...ck that the ratings and specification of the model to be installed is suitable for its intended application 1p3w 120 208V 100A 1p3w 120 208V 200A Polaris CT current rating must be more than the main c...

Page 10: ...Installation b Make sure to turn off all power sources to the Polaris and any adjacent power sources before performing the installation Turn off the power source Please look for the preceding circuit...

Page 11: ...ter Installation c Attach the dedicated CTs to their corresponding terminals making sure to match phases VA VB e g 1 or 2 Phase 3 Wire Red CT Black CT Please see the Terminals and Wiring Diagram secti...

Page 12: ...7 Meter Installation d Connect the voltage terminals of the Polaris to their corresponding phase voltages VA VB VN VA VB VN e g 1 or 2 Phase 3 Wire Please see the Terminals and Wiring Diagram sections...

Page 13: ...voltage input cable connects to the correct terminals on the Polaris meter Check to make sure that each terminal wiring is connected properly Check that the fuse and circuit breaker are neither blown...

Page 14: ...DAE Controls LLC Thank you for choosing DAE products...