3
4
English
Installation
Instruction
s
Verifying Proper Operation
1.
Before
start
ing the test procedure,
turn off
all
burners
, and
see that
all burner
components
and
grates are properly positioned.
2.
Open the
gas-supply
valve
, and c
heck for gas leaks.
3.
Turn on power to the range at the circuit breaker or fuse box.
4.
Use the oven display
to set user preferences and wireless network settings.
5.
On the display, tap
MENU
> BAKE
.
(
The default bake temperature should appear.
)
6.
T
ap
Start.
In
3 minutes, open the door to
see that
the oven
chamber is heating
.
(
The
display
should show BAKE and the preheating temperature.
)
7.
T
ap
OFF.
8.
P
ush
a
knob in
,
and turn it counterclockwise to
HIGH.
(
Within
4
seconds
,
ignition
occur
s
, a
nd
the
ignit
e
r stop
s
sparking. If
ignition does not occur
as expected
, turn off
the knob, wait
5
minutes
for the
gas to dissipate,
then re
try the
test.
9.
After ignition,
turn
the control knob from HIGH to LOW
while
watching
the
flame
height.
If
the
range is installed properly,
the flame
is
steady
and quiet
with
a sharp,
blue inner cone that
var
ies
in length
depending
on
the burner size.
10.
Turn the control knob OFF.
11.
Repeat the ignition test for
the
remaining burners.
Normal Flame
If the range does not operate properly
:
1.
Verify that power and gas are supplied to the range.
2.
Check the electrical connections and gas supply to verify proper installation.
3.
Repeat the above bake test and burner-ignition test.
4.
If the range still does not work, contact Dacor Customer Assurance: (800)
793-
0093 x2813.
Be
ready with
the model/serial numbers
. (See the
data label,
left-side door trim.)
Do not try to repair the
range
yourself. Dacor is not responsible for the cost of correcting
problems caused by a faulty installation.
Removing and Reinstalling the Range
Removing the Range for Service
1.
Close the gas-supply valve.
2.
Turn off power to the range at the circuit breaker or fuse box.
3.
Pull the range out from the wall
Reinstalling the Range After Service
1.
Push the range into position, engaging the anti-tip bracket.
2.
Turn on power to the range at the circuit
breaker or fuse box.
3.
Open the gas-supply valve.