0
I
nstallatIon
c
hecklIst
WARNING
WARNING:
To ensure a safe and proper installation, the following
checklist should be completed by the installer to
ensure that no part of the installation has been
overlooked.
Proper installation is the responsibility of the
homeowner. The importance of proper installation of
your coffee system cannot be overemphasized.
•
•
Is the coffee system connected to, or using only soft
water (4 gpg maximum hardness)? See page 4.
Has the coffee system been cleaned prior to use as
specified in the use and care manual?
Is the coffee system connected to a dedicated,
grounded power receptacle? See Location
Requirements, on page 4.
Is the steam barrier installed? See Page 6.
Is the pressure regulator properly adjusted?
See Page 7.
Are the cabinet glides properly adjusted? See page 8.
Is there a vent hole in the back of the cabinet to allow
heat to escape? See page 8.
Is the coffee system locked into the locking tabs on the
glides? See page 9.
Has the installer verified proper operation?
Have any problems been noted on the warranty card
or during the on-line warranty activation? Has the
warranty been activated on-line or the warranty card
filled out completely and mailed?
□
□
□
□
□
□
□
□
□
□
I
nstallatIon
I
nstructIons
Summary of Contents for CM24T
Page 2: ......
Page 13: ...11 Notes...
Page 14: ...12 Notes...
Page 15: ......
Page 16: ...Copyright 2007 by Dacor Inc All rights reserved Web Site www Dacor com Phone 800 793 0093...