background image

ENGLISH

 

26 

4.1  Dimensions and weights 

The adhesive label on the package indicates the total weight of the system. 
The dimensions below are given in millimetres. 

5.  TANK INSTALLATION 

The  lifting  stations  of  the  Fekabox  110  series  have  various  inlet  and  outlet  possibilities  for  the  pipes. 
Depending on the type of installation and on the local  standards in force it may be necessary to provide a 
siphon,  a  non-return  valve  on  the  pipe  connecting  to  the  public/private  sewer  network  or  to  other  ducts. 
Always refer to the local and/or national regulations, laws and standards in force. Anyway it is recommended 
to  install  check  valves  and  interception  valves  upstream  and  downstream  from  the  station.  An  example  of 
installation is shown in chapter 4. 

Key to Symbols 

Connection of delivery pipe or emergency outlet

Collection pipe inlet

Outlet of power cables and float cables

Connection of ventilation pipe

Recyclable material

Fekabox 110 

DN50/110  

G2

Ǝ

KRUL]RQWDO

RXWOHW

DN50/110 

DN50/110 

DN40

HPHUJHQF\GUDLQ

G2

Ǝ

YHUWLFDO

RXWOHW

DN50

Summary of Contents for FEKABOX 110 Series

Page 1: ...AINTENANCE INSTALLATIONSANWEISUNG UND WARTUNG INSTRUCTIES VOOR INGEBRUIKNAME EN ONDERHOUD INSTRUCCIONES PARA LA INSTALACION Y EL MANTENIMIENTO N VOD K INSTALACI A DR B INSTRUKCJA MONTA U I KONSERWACJI...

Page 2: ...for the collection delivery and ventilation pipes 27 5 4 Gluing the collection and ventilation pipes 28 5 5 Connecting the delivery pipe to the sewer network 28 5 6 Connecting the ventilation pipe 28...

Page 3: ...e appliance by a person responsable for their safety Children should be supervised to ensure that they do not play with the appliance 1 3 Check that the system has suffered no damage during transport...

Page 4: ...basement rooms situated below the level of the sewer network In compliance with the accident prevention regulations in force the FEKABOX 110 cannot be used for conveying inflammable or explosive liqu...

Page 5: ...n valve on the pipe connecting to the public private sewer network or to other ducts Always refer to the local and or national regulations laws and standards in force Anyway it is recommended to insta...

Page 6: ...so as to avoid rotation and floating For this you can use the slots on the base of the tank There must be a horizontal base suitable to bear the weight of the station during its operation Depending o...

Page 7: ...ving drilled the required outlet see par 4 1 5 3 To guarantee a perfect seal it is recommended to use Teflon or suitable glues depending on whether the material being glued is plastic PP or PVC or met...

Page 8: ...n the station Identify the seat for the duct on the bottom of the station open the duct and connect the emergency drainage pipe Check that the coupling is watertight 5 9 Non return valve Install a non...

Page 9: ...stallation kit containing respectively the parts in figure 8 for installation of both the vertical and the horizontal outlet For the assembly of the kit see figure 8 1 Adapter 2 F 1 1 4M not necessary...

Page 10: ...ENGLISH 31 FEKABOX 110 l PREPARED FOR THE FOLLOWING PUMPS FEKABOX 110 FEKA 600 MA FEKA VS VX 550 MA FEKA VS VX 750 MA Fig 9A FEKA 600 Fig 9 FEKA VS...

Page 11: ...e electropump is primed Open the interception valve in the inlet pipe and check that the station is working correctly The flow of liquid coming from the various utilities must not prevent the correct...

Page 12: ...loat moves freely If necessary remove the pump from the tank It is recommended to clean the system at least once a year with running water operating the pump repeatedly 10 TROUBLESHOOTING FAULTS CHECK...

Reviews: