background image

3

Frame Assembly

2.  Add 2 frame connectors  (B) to each corner.

3.  Slide the frame sections together at the corners.

4.  Secure the frame pieces by tightening the hex nut screws 

which are already inserted in the frame.

1.  Unwrap the frame pieces. Before assembling the frame 

pieces, add 2 nuts (A) to either end of the top frame section 
and the top of the side frame for the mounting bracket and 
add 2 nuts to the bottom frame.

Summary of Contents for FullVision

Page 1: ...INSTRUCTION BOOK FOR FullVision ...

Page 2: ...r use of this subject to change without notice or obligation of any kind Milestone makes no representation of warranty expressed or implied regarding the information contained herein Milestone assumes no responsibility for accuracy completeness or sufficiency of the information contained in this document Da Lite is a registered trademark of Milestone AV Technologies All rights reserved Included Ha...

Page 3: ...ners 4 Secure the frame pieces by tightening the hex nut screws which are already inserted in the frame 1 Unwrap the frame pieces Before assembling the frame pieces add 2 nuts A to either end of the top frame section and the top of the side frame for the mounting bracket and add 2 nuts to the bottom frame ...

Page 4: ...Top frame Side frame Top frame to fly 5 Secure the mounting bracket C with provided screws to the previously inserted nuts 6 Measure where to position the brackets Drill holes and position the supplied screws H and I Install the frame as a test first Top bracket method Side bracket method Bracket top frame standard and side frame Bracket top frame to fly F G D E 11 16 1 1 2 3 3 4 1 4 Width 1 4 Wid...

Page 5: ...ens 160 and wider require a spreader bar Connect the top and bottom frame with the spreader bar and connect this by using the two supplied screws D 9 Carefully unpack the screen surface and put on the supplied gloves K before handling the surface NOTE Do NOT handle the projection surface without gloves Position the roller with the projection surface upright in front of the frame Then from left to ...

Page 6: ...e carefully around the corners First do one side then fold over the small rectangular piece of fabric and then fold over the remaining side 13 Hang the FullVision brackets over the screws to position it on the wall 10 First tension the surface so the end of the surface alligns with the frame end After the entire screen is attached you can adjust tensioning where necessary 1 2 3 ...

Page 7: ...7 ...

Page 8: ...IABILITY IS ASSUMED FOR EXPENSES OR DAMAGES RESULTING FROM INTERRUPTION IN OPERATION OF EQUIPMENT OR FOR INCIDENTAL DIRECT OR CONSEQUENTIAL DAMAGES OF ANY NATURE In the event that there is a defect in materials or workmanship of a Da Lite product you may contact our Customer Care Specialists at 3100 North Detroit Street Warsaw IN 46582 574 267 8101 800 622 3737 IMPORTANT THIS WARRANTY SHALL NOT BE...

Reviews: