4
Method 2 (Screens Over 80" Up To 96" In Viewing Width)
1. Use the supplied #10 screws to attach four frame brackets to the
back of the frame as shown in Figure 5.
2. Secure the wall bracket to wall studs at the desired height. Make
sure the bracket is level. The top of the frame will be 1/8" above
the top of the wall bracket when mounted. You will need at least
5/8" clearance above the bracket to hang the screen.
3. To install the lower wall bracket, you must measure the overall
height of the screen frame and subtract 1/4". This is the
dimension from the top of the upper wall bracket to the
bottom of the lower wall bracket. See Figure 6.
4. Unroll the screen on a clean surface. Do not use newspaper. The
viewing side is rolled to the inside of the roll. Place the frame over
the screen surface, and while lifting the frame with one hand,
snap the screen surface onto the frame with the other hand
while maintaining a steady pull on the surface.
5. Position the screen with the attached surface onto the top wall
bracket as shown in Figure 7. Push down at the center of the
bottom frame rail to hook onto the lower wall bracket.
Figure 5
Frame Brackets
4-Pieces
#10 Screws
8-Pieces
Large Wall
Bracket
2-Pieces
Figure 6
W
all
2
1
W
all
Figure 7
Overall Height - 1/4"
Overall Height