10.  At the unrolled screen surface (A), peel back the protective 

paper approximately 3/4” on the top and the bottom. This will 
allow the frame to be attached easily to the screen surface. 

 

NOTE: 

 Do not remove the protective paper completely. This 

will be done at the end of the screen installation in order to 
protect the surface during the hanging process.

Da-Lite recommends that the provided gloves (E) be worn at 
this time in order to prevent damage to the screen surface and 
to provide grip while lifting.

11.  Center the first rubber gasket (F) on the screen surface edge 

and press it into place starting at one end. Repeat this step 
for the three remaining sides of the screen.

12.  Place the frame sections (G) around the screen surface (A). 

Attach to frame (G) over the rubber gasket (F) with set screws 
facing upwards. Use a rubber mallet to gently tap the screen 
frame into place if needed (See Figure 5)

Installation (continued)

13.  Place the hoisting bracket (H) in the center of the top and 

bottom sections of the screen frame. Attach to frame using 
the provided cap screws (I) and a 3/16” hex key.

14.  Starting from the center on each side, tighten all set screws 

on all four sides of the frame using the 1/8” hex key. 
Approximately two threads should be visible on each set 
screw when properly tightened.

15.  Prepare to attach the seam brackets (J) and corner brackets 

(K) by carefully sliding the 3/8" x 1/2" hex head screws (L) 
down the frame channel (two bolts on either side of the seam 
and two on each side of each corner).

16.  Carefully slide the seam bracket (J) under the assembled 

frame, aligning the bracket and 3/8" screws (L) across the 
seam.  Secure using the 3/8" thin hex nuts (M) and tighten 
completely.

17.  Repeat for corner brackets (K).

Figure 5

Hoisting Bracket

Hoisting Bracket

Pre-Attached 

Hoisting Brackets

Frame 

Section

Rubber Gasket

Frame 

Section

Hoisting Bracket

Rubber Gasket

Set Screw

Cap 

Screw

Screen  

(Projector Side)

Seam Bracket

Seam Bracket

Corner Brackets

Summary of Contents for 29526

Page 1: ...INSTRUCTION BOOK FOR Polacoat Flex Plex Screen ...

Page 2: ...o change without notice or obligation of any kind Milestone makes no representation of warranty expressed or implied regarding the information contained herein Milestone assumes no responsibility for accuracy completeness or sufficiency of the information contained in this document Da Lite is a registered trademark of Milestone AV Technologies All rights reserved Installation Video To view a video...

Page 3: ...quired for Installation not provided Screw Gun Drill and Drill Bits 1 2 Open Wrenches 2 Ladders 10 x 1 Countersunk Flat Head Screws x 1 Hex Lag Screws 1 8 3 16 Hex Keys Measuring Tape Level Rubber Mallet Knife ...

Page 4: ...24 Tensioning Assemblies G 6 Frame Pieces F 4 Rubber Gaskets B 6 T Tracks D 3 Lifting Brackets I 4 Cap Screws NOTE Quantities listed are for standard sizes Quantities will vary if a custom screen that is larger than standard is ordered Q 4 Corner Covers L 24 3 8 x 1 2 Hex Head Screws M 24 3 8 Thin Hex Nut K 4 Corner Bracket J 4 Seam Bracket ...

Page 5: ...d transport the carton carefully DO NOT remove the screen surface roll and hardware from the carton for transport CAUTION Do not remove the screen surface and hardware from the end of the carton Removing the carton ends will expose staples that can scratch the screen surface 3 Using four people unroll the screen A Locate one person on each end of the roll with the other two people used as support ...

Page 6: ...is against the wall Secure that end of the track with a 10 screw in the hole closest to the end See Figure 2 Figure 1 2 NOTE Most screen units will have one piece of T track B for the side openings and two pieces each for the top and bottom wall openings Larger sized units above 14 wide may have three pieces of T track B each for the top and bottom openings WARNING Ensure each 10 countersunk screw...

Page 7: ...aching the T track B to the wall This alignment is necessary to allow the trim to snap on easily at the end of the screen installation Ensure the opening is level on all four sides If the opening is not level the T track B will need to be shimmed in order to ensure the screen trim is level once attached to the T track B Figure 2 Figure 3 Installation continued 6 Repeat Steps 4 and 5 until all T tr...

Page 8: ... the top section of the screen in the opposite corner See Figure 4 9 Position the third lifting bracket D 2 from the back of the T track B in the center of the top section of the wall opening and mount with 1 4 X 1 lag screws See Figure 4 NOTE After completing this step there should be three lifting brackets D mounted into the top section of the wall opening behind the T track B Check that these b...

Page 9: ...f needed See Figure 5 Installation continued 13 Place the hoisting bracket H in the center of the top and bottom sections of the screen frame Attach to frame using the provided cap screws I and a 3 16 hex key 14 Starting from the center on each side tighten all set screws on all four sides of the frame using the 1 8 hex key Approximately two threads should be visible on each set screw when properl...

Page 10: ...RNING Screen must be positioned close to but not touching the wall before lifting Do not lift the screen into place if the ropes have not been fed through the hoisting H and lifting brackets D Figure 6 Figure 7 20 Lift the screen assembly to a vertical position on the floor parallel to the wall opening On the projector side of the wall opening one person will be holding all three ropes N without s...

Page 11: ...sembly into place until all three hoisting and lifting brackets attach to each other at the top of the wall opening See Figure 8 Figure 8 T Track 2 Lifting Bracket Hoisting Bracket Screen Assembly Audience Side 22 Once the screen is hanging on the hoisting and lifting brackets carefully remove the seam J and corner K brackets along with the 3 8 screws L and nuts M NOTE During this step be careful ...

Page 12: ...TE Once the lifting brackets have been removed the screen assembly will be held in place by the previously attached tensioning assemblies 26 Tighten all tensioning assemblies O on the top section of the screen assembly until all eight four per frame section are evenly spaced and secure on the top side NOTE Use the alternating method of two to three turns on one assembly then moving to another asse...

Page 13: ...gure 10 NOTE Custom screens may use three pieces 32 Starting at the audience side bottom left corner align a side piece of trim P with the side edge of the screen The end should be approximately 3 up from the corner of the wall opening When aligned snap the trim P onto the T track while moving along the length of the piece until firmly in place Figure 10 33 Repeat Step 31 for the top trim pieces P...

Page 14: ... at Da Lite s option the defective part of the merchandise Returns for service should be made to your Da Lite dealer If it is necessary for the dealer to return the screen or part to Da Lite transportation expenses to and from Da Lite are payable by the purchaser and Da Lite is not responsible for damage in shipment To protect yourself against damage or loss in transit insure the product and prepa...