
DXS-3410 Series
Layer 3 Stackable Managed Switch
Hardware Installation Guide
11
Slide the retainer through the tie wrap until the end of the
cord.
Circle the tie of the retainer around the power cord and
into the locker of the retainer.
Figure 3-7 Slide the Retainer through the Tie Wrap
Figure 3-8 Circle around the power cord
Fasten the tie of the retainer until the power cord is secured.
Figure 3-9 Secure the power cord
Summary of Contents for DXS-3410 Series
Page 1: ...Version 1 00 2023 12 18...
Page 54: ......