Then, use the screws provided with the equipment rack to mount the switch in the rack.
Figure 3 — Installing the switch in a rack
Installing Transceivers into the Transceiver Ports
The DSS-200G-28MP switch is equipped with the ports for connecting the SFP
transceivers.
Figure 4 — Inserting transceivers into the transceiver ports
Grounding the Switch
This section describes how to connect the switch to the ground. You must complete this
procedure before powering on the switch.
Required tools and equipment:
Ground screws: One M4 x 6 mm (metric) pan-head screw.
Grounding cable (not included in the accessory kit): The grounding cable should be
sized according to local and national installation requirements. Depending on the
4